Space and airflow requirements
Space and airflow requirements
To allow for servicing and adequate airflow, observe the following space and airflow requirements when deciding where to install a rack:
Leave a minimum clearance of 63.5 cm (25 in) in front of the rack.
Leave a minimum clearance of 76.2 cm (30 in) behind the rack.
Leave a minimum clearance of 121.9 cm (48 in) from the back of the rack to the back of another rack or row of racks.
Hewlett Packard Enterprise servers draw in cool air through the front door and expel warm air through the rear door. Therefore, the
front and rear rack doors must be adequately ventilated to allow ambient room air to enter the cabinet, and the rear door must be
adequately ventilated to allow the warm air to escape from the cabinet.
CAUTION:
CAUTION: To prevent improper cooling and damage to the equipment, do not block the ventilation openings.
When vertical space in the rack is not filled by a server or rack component, the gaps between the components cause changes in airflow
through the rack and across the servers. Cover all gaps with blanking panels to maintain proper airflow.
CAUTION:
CAUTION: Always use blanking panels to fill empty vertical spaces in the rack. This arrangement ensures proper
airflow. Using a rack without blanking panels results in improper cooling that can lead to thermal damage.
The 9000 and 10000 Series Racks provide proper server cooling from flow-through perforations in the front and rear doors that
provide 64 percent open area for ventilation.
CAUTION:
CAUTION:
If a third-party rack is used, observe the following additional requirements to ensure adequate airflow and to prevent
damage to the equipment:
Front and rear doors—If the 42U rack includes closing front and rear doors, you must allow 5,350 sq cm (830 sq in)
of holes evenly distributed from top to bottom to permit adequate airflow (equivalent to the required 64 percent
open area for ventilation).
Side—The clearance between the installed rack component and the side panels of the rack must be a minimum of 7
cm (2.75 in).
Space and airflow requirements
55
Содержание HPE ProLiant DL345 Gen10 Plus
Страница 28: ...HPE Basic Drive LED definitions 28...
Страница 33: ...Fan bay numbering The arrow points to the front of the server Fan bay numbering 33...
Страница 46: ...Removing a riser cage 46...
Страница 54: ...Operational requirements Operational requirements 54...
Страница 68: ...Installing the bezel and bezel lock Installing the bezel and bezel lock 68...
Страница 91: ...Connecting a DC power cable to a DC power source 91...
Страница 109: ...15 Connect each power cord to the power source 16 Power up the server Installing a storage controller 109...
Страница 115: ...Riser and riser cage options Riser and riser cage options 115...
Страница 120: ...Expansion slots Expansion slots 120...
Страница 129: ...The installation is complete Installing an accelerator or GPU 129...
Страница 140: ...HPE Trusted Platform Module 2 0 Gen10 Plus option HPE Trusted Platform Module 2 0 Gen10 Plus option 140...
Страница 143: ...Installing and enabling the HPE TPM 2 0 Gen10 Plus option Installing and enabling the HPE TPM 2 0 Gen10 Plus option 143...
Страница 144: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 144...
Страница 153: ...Cabling This chapter includes cabling guidelines and diagrams for internal component cabling Cabling 153...
Страница 156: ...Storage cabling Storage cabling 156...
Страница 157: ...Drive power cabling Drive power cabling 157...
Страница 160: ...2 SFF drive power cabling 2 SFF drive power cabling 160...
Страница 161: ...Storage controller cabling Storage controller cabling 161...
Страница 166: ...8 SFF SATA Box 3 to system board connector J17 cabling 8 SFF SATA Box 3 to system board connector J17 cabling 166...
Страница 177: ...2 SFF SAS SATA Box 4 to SAS expander port 9 cabling 2 SFF SAS SATA Box 4 to SAS expander port 9 cabling 177...
Страница 188: ...2 SFF SAS SATA Box 4 to system board J1 port 9A cabling 2 SFF SAS SATA Box 4 to system board J1 port 9A cabling 188...
Страница 191: ...Energy pack cabling Energy pack cabling 191...
Страница 193: ...Storage controller backup power cabling 193...
Страница 194: ...M 2 SATA SSD cabling M 2 SATA SSD cabling 194...
Страница 196: ...Fan cabling Fan cabling 196...
Страница 197: ...OCP bandwidth upgrade cabling OCP bandwidth upgrade cabling 197...
Страница 198: ...Serial port cabling Serial port cabling 198...
Страница 199: ...Chassis intrusion detection switch cabling Chassis intrusion detection switch cabling 199...
Страница 200: ...Front I O cabling Front I O cabling 200...
Страница 201: ...Software and configuration utilities Software and configuration utilities 201...
Страница 229: ...Keeping the system current Keeping the system current 229...
Страница 242: ...Troubleshooting Troubleshooting 242...
Страница 245: ...System battery replacement System battery replacement 245...
Страница 249: ...Safety warranty and regulatory information Safety warranty and regulatory information 249...
Страница 253: ...Ukraine RoHS material content declaration Ukraine RoHS material content declaration 253...
Страница 255: ...Specifications Specifications 255...
Страница 268: ...Support and other resources Support and other resources 268...