Hewalex PCWU 2.5kW Скачать руководство пользователя страница 19

23.04.2014
19 / 21

Guarantee Certificate

Manufacture date (Quality Control stamp).............................

Receipt or sales invoice should be enclosed with Guarantee Certificate. Warranty is null and void if the following is not filled.

WARRANTY TERMS:

1.

HEWALEX grants a 3-year warranty for failure-free operation of the HEWALEX PCWU 2.5kW heat pump.

2.

During warranty period the user is entitled to free of charge repairs of any damage occurring through the fault of manufacturer.

3.

HEWALEX is discharged from any warranty liability for faulty unit operation, which may occur due to its use contrary to Operating Manual
instructions,  as  well  as  carrying  out  any  repairs  and  modifications  by unauthorised  persons,  and  due  to  any  other  damage  occurring  not
through the fault of the manufacturer.

4.

Any defects revealed during warranty period will be eliminated within 30 days from the date of reporting them by the user.

5.

Warranty  claims  should  be  sent  to  Claims  Department  of Hewalex  Sp.  z  o.o.  Sp.K.,  ul.  Słowackiego  33,  43-502,  Czechowice-Dziedzice,
Poland (tel.:.+48(32) 214 17 10, GSM: + 48 723 232 232, INFOLINE: 0801 000 810, hewalex.pl).

6.

Buyer  is  entitled  to equipment  replacement  with  a  new  one, or  return  of  incurred  costs  in  case  of  finding  manufacturing  defect,  which  is
impossible to eliminate.

7.

Warranty  rights  may  be  executed  only  on  the  basis  of  submitted Guarantee  Certificate  and  completed  checklist procedure. Not  filled  or
partially  filled  checklist is  void. One  checklist  sheet  must  be  sent  to HEWALEX according  to  the  terms  and  conditions  specified  in  the
checklist. Failure to send installation checklist is the basis to reject service application.

8.

Unjustified visits of service personnel may provide grounds for the manufacturer to charge user with applicable costs.

9.

In particular, technical warranty terms and conditions are applicable:

A) It is prohibited to repair the unit without contact with HEWALEX service. In case of incorrect equipment operation, report failures by
phone (32)  214  17  10) or e-mail ([email protected]). Depending  on  failure  type,  service  team  will  be  sent  to  the  site,  or  guidelines
concerning repair of minor defects will be provided.

B) It is allowed to connect the heat pump to correctly working electrical system only.
Installation requirements:
- power cable to the mains socket min. 3x2.5mm

2

300/500V, complying with the 227IEC53

- current protection: B16 or C16
- differential-current protection: 30mA
- correctly made earth installation (grounding resistance should not exceed 4Ω).
All the above power supply parameters are standard and do not go beyond applicable norms.

C) Water in the system must satisfy requirements specified for potable water (O.J. (Poland) no. 203, item 1718).
Important for own water intakes:
- pH ranges between 6.5 and 9.5
- conductivity under 2500 [μS/cm at 20 °C]
- ammonia under 0.5 [mg/l]
- nitrates under 50 [mg/l]
- chlorides content under 250 [mg/l]
- copper  under 2  [mg/l, permissible  value  provided  that  it  does  not  cause  any change  in  water  colour  due  to  its  corrosive

aggressiveness]

- sulphates under 250 [mg/l]
- hardness 60-500 [mg CaCO

3

]

D) Water, air and wiring systems for the unit should be made according to the guidelines and connection diagram.

E) Select  proper  location  for  the  unit  installation. Any  damage  caused  by  improper  selection  of  the  equipment  location  will  not  be
covered  by  the  guarantee (that  is  caustic  and  polluted air drawn  into  the heat  pump, unlevelled  equipment, foundation tilting  the unit,
installing in an unheated room).

H) It  is  prohibited  to  switch  off  the  unit  during  break  in  operation (e.g. in  wintertime). Otherwise,  user will  be  solely  responsible  for
eliminating circulating pump protection against seizure and anti-freezing protection.

HEWALEX

Spółka z ograniczoną odpowiedzialnością Sp. k. [Ltd, Limited Partnership]
ul. Słowackiego 33
43-502 Czechowice – Dziedzice, Poland
Tel.:+48(32) 214 17 10

Содержание PCWU 2.5kW

Страница 1: ...the most complex controller in the HUW heat pump market in Poland possibility to control and analyse operation statistics in EKONTROL pL a separate LAN module is needed access to thoroughly metered t...

Страница 2: ...Secure the unit COOLING RELATED failures Do not put your fingers inside the unit housing if it is connected to power supply There is a hazard of burning electric shock or cutting your fingers In part...

Страница 3: ...tory element of power supply If user observes any alarming symptoms e g noise or odour indicating abnormal equipment operation it is required to cut off power supply and consult authorised service cen...

Страница 4: ...between 6 5 and 9 5 conductivity under 2500 uS cm at 20 C ammonia under 0 5 mg l nitrates under 50 mg l chlorides content under 250 mg l copper under 2 mg l permissible value provided that it does no...

Страница 5: ...nd or service works one must satisfy important for environment requirements regarding recovery reuse and utilisation of materials In particular keep to the following standards concerning cooling mediu...

Страница 6: ...nt drops with decreasing air temperature and due to physical parameters of the medium in compressor system it becomes impossible to receive heat for certain low temperature of the source The same prob...

Страница 7: ...the compressor in heat pump system 1 Increases cooling medium pressure and temperature to allow efficient heat transfer in heat pump condenser 2 The compressor has considerable impact on the efficien...

Страница 8: ...NUOUS factory setting INTERM Solid fuel fired boiler B shown in diagrams no 5 7 9 Max boiler pump deactivation temperature 10 85 C factory setting 65 C Min boiler pump activation temperature 30 60 C f...

Страница 9: ...eat pump Press arrow down to move to internal diagram of heat pump Press arrow up or wait few seconds to return to the main screen Press this button to enter individual settings menu A list of setting...

Страница 10: ...llation and service instructions in the controller map Operation parameters settings After approval we may enter parameter settings screen view below on the left side Scrolling arrow down we may also...

Страница 11: ...olid fuel fired boiler is working heat pump will not activate when the option of heating with solid fuel fired boiler is set Parameters of accessory equipment The second item in the list of Parameter...

Страница 12: ...is too low min temperature of air supplied to the heat pump or it is switched off manually from the controller level then heater may keep heating up the tank to higher temperatures because in this ca...

Страница 13: ...list is the priority of heating with solid fuel fired boiler below to the right If YES value is set and conditions required for boiler pump activation are fulfilled all other pieces of equipment opera...

Страница 14: ...wish to activate the Anti Legionella function It will start on midnight Sunday Monday and keep running no longer than until 6 a m on Monday The superheating function will end earlier if temperature of...

Страница 15: ...ng of inactivity time until backlight dimming the screen will get dimmed if user does not touch any keys for preset time Sounds Sound parameters allow setting keyboard sound if set to YES we will hear...

Страница 16: ...Mediterranean countries however occasionally it appears in Poland as well An effective method to destroy Legionella bacteria is periodic tank superheating to water temperature reaching 70 C At this te...

Страница 17: ...ipment operation statistics Another important advantage of the unit remote control is round the clock observation by the system and prompt information concerning alarms in the installation A network L...

Страница 18: ...ng medium during condensation As a result of this the COP coefficient value depends not only on ambient temperature but on air humidity as well 4 Is it possible to connect the PCWU 2 5kW heat pump to...

Страница 19: ...are applicable A It is prohibited to repair the unit without contact with HEWALEX service In case of incorrect equipment operation report failures by phone 32 214 17 10 or e mail serwis hewalex pl De...

Страница 20: ...NO 11 Is the system provided with tested safety valve max 7 bar per HUW tank and does water flow after depressing the valve handle YES NO 12 Are suitable valves installed which would according to the...

Страница 21: ...and organisational conditions which should be met by computer equipment and systems used for personal data processing O J Poland No 100 item 1024 Your personal information is kept in adequately secur...

Отзывы: