
2-12
2.8 Preparation for Initial Start-Up
Before the machine is operated for the first time, the
following points must be checked:
1
Check the oil level with the marks in the charging
hole.
2
Check whether the central lubrication oil level
lies between the two markings.
3
With the cooling lubricant tank inserted (see
notes in chapter 5), fill up cooling lubricant
via the protective enclosure’s return sieve.
4
Fill the lubricating oil circulatory system with the
oil provided until the oil level can be seen in the
inspection windows.
Note
Before initial start-up of the 4th and 5th axis please
see chapter 4.
2.8 Preparation for Initial Start-Up
Содержание UWF 902 H
Страница 1: ...Universal Toolroom Milling and Boring Machine Operating Manual UWF 902 H ...
Страница 2: ...1 2 3 4 5 12 13 15 14 9 10 11 8 7 16 6 17 ...
Страница 4: ...Control TNC 426 ...
Страница 14: ...1 2 150 150 900 130 500 458 16 10 195 65 450 600 1 2 Speed Torque Power Curves 1 2 Speed Torque Power Curves ...
Страница 18: ...1 6 1 5 Machine Dimensions Space Needed 1 5 Machine Dimensions Space Needed for UWF 902 H with UTC 34 ...
Страница 30: ...2 11 2 2 7 Preparation for Initial Start Up 4 1 ...
Страница 64: ...4 2 4 1 2 Technical Data Tool Changer Tool changing horizontal Tool changing vertical ...
Страница 74: ...4 12 0 450 180 18 468 30 85 10 465 47 63 14 H7 ca 245 ca 470 ca 75 208 0 500 73 92 4 2 2 ...
Страница 84: ...4 22 3 2 1 4 4 NC Rotary Table 1 500 mm diameter clamping plate 2 650 mm diameter clamping plate ...
Страница 91: ...4 29 4 4 5 1 Cover plate 2 Recess 3 Taper pin 4 Hand crank ...