16
ON-DECK MOUNTING INSTRUCTIONS
1. Place the assembled slide on the deck relative to the pool wall. Ensure
that the exit flume clears any coping. Slide may be angled slightly
providing all dimensions are maintained as noted in the Manufacturer’s
Placement Instructions noted in the following section.
2. With the slide in its proper location, center punch or otherwise mark
through the (8) mounting holes at the bottom of the ladder and pedestal
so that a visible mark is apparent on the concrete.
3. Move the assembled slide aside to facilitate drilling of the anchoring
holes.
4. Using a power drill and a 1/2” concrete drill bit, drill the holes to a depth
of 4”. Use tape or a marking on the drill bit to ensure that the hole for the
anchor is drilled to the required depth. Maintain drill hole straight and
perpendicular for proper holding strength of anchor stud.
5. Clear the holes of all debris. Assemble anchor with nut and washer so
that the top of the nut is flush with the top of the anchor. Move the slide
over the holes before inserting the anchors. Drive anchor through
the slide mounting holes so that nut and washer are flush with the
surface material.
6. Expand anchor by tightening nut 3 to 5 turns. Once anchor is set remove
nut and install a lock washer, item # (3), and retighten nut to a torque of
25 ft.-lbs.
Содержание S.R. SMITH
Страница 3: ...3 SEE APPENDICES A and B pg 17 for additional slide layout details Figure 1 ...
Страница 17: ...17 APPENDIX A ...
Страница 18: ...18 APPENDIX B ...