background image

 

 

14 

Figure 16 

MANUFACTURER’S PLACEMENT INSTRUCTIONS 

 
PROPER ASSEMBLY, INSTALLATION, USE, AND SUPERVISION IS ESSENTIAL FOR PROPER 
OPERATION AND TO REDUCE THE RISK OF SERIOUS INJURY OR DEATH. 

 

1.  The critical dimensions for placement of the Helix are as shown in Figures 15 and 16. 
 

 

A.  The slide exit runway surface shall not exceed twenty inches (20”) above the water surface as 

shown in Figure 15. 

B.  The slide shall be positioned so that all water flowing off the runway exit drops into the pool. The 

recommended overhang is 4 inches. 

C.  The minimum depth of water below the exit lip of the slide shall be three feet (3’) and increase to 

four feet six inches (4’-6”) at Pt. A, which is a distance of four feet six inches (4’-6”) from the exit 
lip of the slide as shown in Figure 15. 

D.  A minimum depth of four feet six inches (4’-6”) shall be maintained at a distance of nine feet (9’) 

along the extended centerline of the slide from Pt. A. as shown in Figure 15. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
2.  A minimum clearance area in front of the slide shall be maintained at all times as 
follows: 
  
The minimum clearance distance on either side of the extended centerline of the 
slide runway shall not be less than three feet six inches (3’-6”) at a point no less 
than two feet six inches (2’-6”) from the exit lip of the slide and extending a distance 
of thirteen feet six inches (13’-6”) in front of the slide as shown in Figure 16. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DECK/COPING SURFACE

3' MIN.

EXIT

RUNWAY SURFACE

PLUMBLINE

20" MAX.

WATER LEVEL

ENTRANCE

Pt.A

13'-6" MIN.

9' MIN.

4'-6"

4'-6" MIN.

4'-6" MIN.

Figure 15 

S LID E  M IN IM U M  C LEA R A N C E  A R E A

3

'-

6

"

CL

2

'-

6

"

1

3

'-

6

"

3

'-

6

"

E

X

TE

N

D

E

D

 C

E

N

TE

R

L

IN

E

Содержание S.R. SMITH

Страница 1: ...LLC 2013 JUL13 CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P O Box 400 1017 SW Berg Parkway Canby Oregon 97013 Phone 503 266 2231 Fax 503 266 4334 www srsmith com ASSEMBLY AND INSTALLATION INSTRUCTIONS ...

Страница 2: ...DAMAGE OCCURRED IN TRANSIT AND THAT A DAMAGED PART IS NOT USED PROPER INSTALLATION CANNOT BE OVERSTRESSED AS AN IMPROPER INSTALLATION VOIDS S R SMITH S WARRANTY AND MAY AFFECT THE SAFETY OF THE USER INSTALLER MUST GIVE TO SLIDE OWNER HELIX SLIDE INSTALLATION AND OWNER S MANUAL THE WARRANTY CARD AND ANSWER ALL QUESTIIONS REGARDING SAFE AND PROPER USE AND SLIDE MAINTENACE FOR COMPLETE SLIDE SAFETY I...

Страница 3: ...3 SEE APPENDICES A and B pg 17 for additional slide layout details Figure 1 ...

Страница 4: ...Bolt 1 ea 14 05 782 1 5 PVC Pipe Strap 2 ea 15 05 767 1 Pipe Clamp 2 ea 16 05 770 1 Ball Valve Gray 1 ea 17 05 784 1 Coupling 1 ea 18 05 773 Garden Hose Adapter 1 ea 19 8 532 5 HIGH X 5 WIDE X 32 LONG RUBBER GASKET 1 ea 20 05 643 Dark Gray PVC 1 Slip Pipe Fitting Female Tee SCH80 1 ea 21 05 660 D G 1 PVC Slip Reducer to Threaded Female SCH 80 1 ea 22 05 667 3 8 to1 2 barbed 90 elbow fitting 1 ea 2...

Страница 5: ...e any gasket has fallen off during shipping If gasket installation is required follow the instructions below The gasket on the face of the ladder is not installed in the factory but detailed instructions are provided in step 8 on page 8 Apply gasket PN 8 532 in the required locations as shown in the figures below Place gasket along the section to determine the length needed Cut gasket to appropria...

Страница 6: ...part to the runway exit section as shown in Figure 4 by inserting the two lag screws into the holes located in the bottom of the pedestal 2 Before inserting the lag bolts into the side of the runway exit part 1 4 pilot holes must be drilled into the center of each of the recesses each location is marked with a dimple showing where to drill The pilot holes should be drilled through both the runway ...

Страница 7: ...d cap screws into the threaded inserts as shown in Figure 6 Do not fully tighten the screws at this point start the screws into the threaded inserts Note Be sure to apply anti seize to all fasteners to prevent galling 6 Insert the button head cap screws into the back side of the ladder as shown in Figure 7 Tighten the screws until snug Go back and fully tighten the screws from Step 5 Note Be sure ...

Страница 8: ...ference images below Do not make too tight of a bend radius with the gasket when transitioning the gasket up the vertical edges of the joint The transition radius should be as large as possible Making too tight of a bend radius will cause the gasket to kink and possibly leak The gasket should be centered on the available space in the vertical area of the joint see reference images below Once the g...

Страница 9: ...he hardware shown in Figure 8 Tighten until the lock washer is fully compressed Notes It may take more than one person to perform this step Verify that the gasket material is properly attached before assembling the parts Be sure to apply anti seize to all fasteners to prevent galling 10 Apply a 25 inch bead of Silicone sealant Silicone II or similar around the base of the cone of the slide s cente...

Страница 10: ...l fasteners to prevent galling 12 Finish assembling the two runway sections using the hardware shown in Figure 11 Note Be sure to apply anti seize to all fasteners to prevent galling a First the 2 Hex Head Tap Bolt Item 13 should started into the threaded insert do not tighten at this point b Install the 5 Button Head screw Item 9 into the outside rail and fully tighten c Install the hex bolts Ite...

Страница 11: ...nd the 1 PVC Flex Hose 23 in the recessed area of the ladder and does not interfere with movement of the handle on the 1 Ball Valve 16 c With the components oriented in the correct position make reference marks on the 1 Ball Valve 16 1 PVC Slip Pipe T Fitting Female 20 and 1 PVC Pipe 2 long 25 to ensure correct orientation before gluing d When attaching the assembled components with 1 5 Pipe Strap...

Страница 12: ...nect the Polypropylene Tubing 27 to the small ball valve attached to the top runway section by pushing the Polypropylene Tubing 27 into the end of the ball valve firmly as far as it will go See Figure 13 20 Secure the assemblies to the recessed area under the slide ladder by attaching the 1 5 PVC Pipe Straps 14 with the 14 Pan Head Screws 11 See Figure 12 Detail A 21 Secure the 1 PVC Flex Hose 68 ...

Страница 13: ...r the slide has been mounted to the deck attach the stub up to the plumbing assembly installed in the ladder 4 The helix can handle up to 20 gallons per minute Water flow to the main water supply is to be regulated using the ball valve 16 near the center of the ladder The fountain feature can be regulated via the small ball valve just under the top of the ladder Figure 13 shows the location of the...

Страница 14: ... of four feet six inches 4 6 from the exit lip of the slide as shown in Figure 15 D A minimum depth of four feet six inches 4 6 shall be maintained at a distance of nine feet 9 along the extended centerline of the slide from Pt A as shown in Figure 15 2 A minimum clearance area in front of the slide shall be maintained at all times as follows The minimum clearance distance on either side of the ex...

Страница 15: ... in Figure 17 C DIMENSION FOR BOARD AB BC W DIMENSION FOR BOARD WIDTH AT PT C B The minimum clearance area of a slide or diving board shall not intersect any coping or rope and float line as shown in Figure 18 The minimum clearance area of a slide or diving board may intersect each other provided that they are not used simultaneously CHART 1 BOARD MINIMUM CLEARANCE AREA POOL TYPE C DIMENSION W DIM...

Страница 16: ...the anchoring holes 4 Using a power drill and a 1 2 concrete drill bit drill the holes to a depth of 4 Use tape or a marking on the drill bit to ensure that the hole for the anchor is drilled to the required depth Maintain drill hole straight and perpendicular for proper holding strength of anchor stud 5 Clear the holes of all debris Assemble anchor with nut and washer so that the top of the nut i...

Страница 17: ...17 APPENDIX A ...

Страница 18: ...18 APPENDIX B ...

Отзывы: