background image

                             INSTALLATION MANUAL – 2012 

 

13 

HUSA-EN-UL-REV 2.0 APR 16 2012 

• The photovoltaic solar module has been designed to work with levels of incidental irradiance normally 

found on the Earth´s surface.  DO NOT concentrate the radiation without the express consent of Helios 

Solar Works as this concentration without rigorous and uniform control can produce malfunctions and can 

affect some cells of the module.  

• The photovoltaic module produces a voltage in the form of current that always continues as long as the 

unit is illuminated.  As a precaution, it is recommended that the module should be covered for its handling 

and/or connection or otherwise the connection should be done in hours of low irradiance intensity.  

• The tools used to connect the modules must comply with provincial electrical safety regulations. They 

must be dry and have the correct level of insulation. 

• The connection and disconnection of the photovoltaic modules can produce sparks.  DO NOT attempt to 

connect or disconnect the modules in the presence of flammable substances.  

• Under normal conditions, a photovoltaic module is likely to experience conditions that produce more 

current and/or voltage than reported at standard test conditions.  Accordingly, the values of ISC and VOC 

marked on this module should be multiplied by a factor of 1.25 when determining component voltage 

ratings, conductor capacities, fuse sizes, and size of controls connected to the PV output.  Please refer to 

the local electrical safety code for additional information. 

Содержание 6T Series

Страница 1: ...PHOTOVOLTAIC SOLAR MODULE MANUAL Operation Maintenance and Installation 2012...

Страница 2: ...DUE TO SOLAR RADIANCE TEMPERATURE 8 POTENTIAL POWER CURVE 9 JUNCTION BOX 10 DIODE CHARACTERISTICS 11 WARNINGS AND ELECTRICAL RISKS 12 CONNECTION LIMIT OF THE MODULES 14 MODULE WIRINGS 14 RECOMMENDATI...

Страница 3: ...recommendations in this manual Helios Solar Works disclaims any liability for breakage deterioration or the loss of performance of any of our modules resulting from the incorrect installation use and...

Страница 4: ...al shorting fast acting fuses of 15 amps are to be used when connecting in series Figure 1 Cross section of a module identifying different components ALUMINIUM FRAME ENCAPSULANT TABS PHOTOVOLTAIC CELL...

Страница 5: ...INSTALLATION MANUAL 2012 4 HUSA EN UL REV 2 0 APR 16 2012 6T Series...

Страница 6: ...INSTALLATION MANUAL 2012 5 HUSA EN UL REV 2 0 APR 16 2012 7T2 Series...

Страница 7: ...INSTALLATION MANUAL 2012 6 HUSA EN UL REV 2 0 APR 16 2012 9T6 Series...

Страница 8: ...ubject to change Electrical Values In actual conditions the variation of the parameters of operation for the cells will be related to the variation of irradiation received and the actual temperature T...

Страница 9: ...ge Curves Variation due to Solar Radiance Temperature Figure 2 Variation of the work curve Amps Voltage according to the incidental solar radiance to a cell temperature of 25 C Figure 3 Variation of t...

Страница 10: ...nt In the above figure it can be observed that there is a point for which the product I x V reaches its maximum This point called the maximum power point determines the expressed peak power using the...

Страница 11: ...ent passes through two bypass diodes the circuit board and outputs before entering two isolated copper cables with multi type connectors The junction box does not require any extra field wiring at the...

Страница 12: ...gy can lead to dangerous overheating and affect the cell Damage can include but is not limited to the release of its anti reflection cap the perforation of the P N union or the breakage of the solderi...

Страница 13: ...that dropping can result in glass breakage A module with a broken glass must not be installed Broken glass can produce fragments that may cause injury to personnel handling it The module s glass is t...

Страница 14: ...tion should be done in hours of low irradiance intensity The tools used to connect the modules must comply with provincial electrical safety regulations They must be dry and have the correct level of...

Страница 15: ...ks modules with electrical insulation of 1000 VDC Therefore when installing modules where IEC standards hold precedence 6T series module can be connected to each other in groups of up to 21 7T2 series...

Страница 16: ...can support them using anchors that take into account the constraints imposed by the resulting movements of the processes of thermal expansion and contraction To achieve the maximum annual yield the i...

Страница 17: ...d be installed on at least a 20 angle Each module should be situated with at least 15cm or 6in of open space behind it to ensure that the ventilation dissipates the heat produced by the cells and that...

Страница 18: ...led in the proximity of highly flammable substances e g filling stations gas containers paint equipment since the connection and disconnection process may produce sparks The modules must not be instal...

Страница 19: ...from the positive terminal of one module to the positive terminal on the following Connect the quantity of modules that match the voltage specifications of the inverters used in the system The module...

Страница 20: ...o the module frame the diameter M8 5 16 groundings holes on the module frame identified with a yellow label To ensure a conductive connection i e to penetrate the non conductive coating on the frame a...

Страница 21: ...designed for use with size 6 12 AWG copper conductor wire and allow connecting the system to equipment ground connector UGC 1 grounding clips should be preassembled with top mounting clamps in order t...

Страница 22: ...e dimples will contact the aluminum rail Slip the lug portion on top of the washer and install standard flat washer lock washer and nut Tighten the nut until the dimples are completely embedded into t...

Страница 23: ...les can be mounted on a roof freestanding modules turn a class B rooftop into a class C rooftop Use appropriate corrosion proof fastening materials Top or bottom clamping methods will vary and are dep...

Страница 24: ...g possible effects of aging or corrosion In this inspection special attention should be given to the integrity of the glass the aluminum frame the silicone seals the waterproof of the junction box oxi...

Страница 25: ...ht lead to freezing increasing the separation of the frames Regardless the module may continue producing power between 50 and 70 of its capability weather resistance will be compromised though On occa...

Страница 26: ...L 2012 25 HUSA EN UL REV 2 0 APR 16 2012 It is the owner s and operator s responsibility to determine and follow all national and local codes and regulations related to the use and installation of pho...

Страница 27: ...gh Intertek Certificates Certificate Helios USA CE Certificate of Helios Solar Works Guarantee Factory Certificate T V Integrated Modules Certificate T V Monocrystalline Modules Certificate T V Multic...

Отзывы: