background image

 

 
 

 

CHECKING FOR LEAKS 

 

 

Let the water run through the unit for a few seconds.                                                                           

Close the outlet and check that no pipe joints leak. 

 

ADJUSTING THE SERVICE VALVE 

 

 

If the unit is to supply a basin, 

- turn on the hot water tap fully at the basin. 
- turn the service valve on slowly until the neon illuminates on the product (max temperature). 

- adjust the service valve until the water comes out of the tap at the required temperature.  
  allowing for the temperature of the water to settle after each adjustment 
- check that the unit works correctly when the basin tap is closed and then opened again: 

  if not, adjust the service valve slightly. 

 

 

If the unit is to supply a shower, 

- turn the hot water tap on the mixer unit fully on. 
- turn the service valve clockwise until the neon light goes out, then turn it back until the 

  neon just comes on. 

-

 

check the water temperature at the handset and, if necessary, turn the cold tap on and adjust  

  to get the desired shower temperature. 

 

WARNING:  YOU MUST REGULARLY INSPECT THE SHOWER HOSE FOR WEAR                                                                

AND DAMAGE.  REPLACE IF NECESSARY, OR EVERY TWO YEARS,                                                          
WITH OUR APPROVED PART. 

 

WARNING:  IN ORDER TO MAINTAIN THE PERFORMANCE OF YOUR SHOWER, 

   YOU MUST DESCALE THE SHOWER HANDSET REGULARLY. 

 
All water contains particles of lime-scale, which build up in the shower handset and unit reducing the 
performance. 
It is therefore important to clean the shower handset by simply rubbing the rubber nozzles, or 

soaking in proprietary lime-scale remover and rinsing thoroughly before use. 
The frequency of this will depend on water hardness and experience. 

 

Explain to the user that when the unit is used, the hot water tap should be turned fully 
on so that the unit will operate correctly. 

 

 

 
 
 
 

 
 
 

 
 
 

 
 

COMMISSIONING YOUR 

MULTIFLOW

 

 

 

 

Содержание Multiflow 10.8kW

Страница 1: ...h the user after installation and demonstration It should be kept in a safe place as you may need to refer to it for general instructions or future maintenance HEATSTORE MULTIFLOW UNVENTED INSTANTANEOUS WATER HEATER Installation and User Guide ...

Страница 2: ... the current edition of BS 7671 the IEE Wiring Regulations and Part P of the Building Regulations in force at the time of installation Installations outside England and Wales must also conform to any local regulations in effect This appliance is intended to be permanently connected to the fixed electrical wiring of the mains supply with its own dedicated supply Ensure that the mains water supply m...

Страница 3: ...namic Water Pressure Basin Shower Minimum Maximum Minimum Maximum Up to 9 5kW 10 psi 0 7 bar 69 kPa 150 psi 10 3 bar 1035 kPa 15 psi 1 1 bar 103 kPa 150 psi 10 3 bar 1035 kPa Up to 10 8kW 15 psi 1 1 bar 103 kPa 150 psi 10 3 bar 1035 kPa 20 psi 1 4 bar 138 kPa 150 psi 10 3 bar 1035 kPa Up to 12 0kW 20 psi 1 4 bar 138 kPa 150 psi 10 3 bar 1035 kPa 25 psi 1 8 bar 172 kPa 150 psi 10 3 bar 1035 kPa FIX...

Страница 4: ... the backplate diagram 3 Feed the cable through the grommet before you fix the unit to the wall Fixing to the wall Undo the retaining nuts and take the front cover off the unit Hold the backplate in position against the wall whilst you mark the four fixing holes Drill the holes and fix the unit to the wall using the screws supplied Plumbing the unit WARNING IF A NON RETURN VALVE IS FITTED IN THE I...

Страница 5: ...Connecting the unit to the pipes The inlet and outlet are clearly marked on the unit They each have a Ø15mm straight shank connections The unit comes with a service valve diagram 5 which should be fitted on the inlet of the unit The valve can be used to turn off the water supply to the unit if it needs servicing or to reduce the main supply flow if it is too high Fitting the attachments If the uni...

Страница 6: ... 6 point X to X to enable 10mm and 16mm to be correctly installed No cutting is required for 6mm cable In all cases the outer sheath of the cable MUST project through the grommet diagram 6 if side entry is used This will prevent water getting into the unit Strip back the insulation on the LIVE brown or red and NEUTRAL blue or black mains wires about 8mm Strip back any insulation on the EARTH green...

Страница 7: ...on light goes out then turn it back until the neon just comes on check the water temperature at the handset and if necessary turn the cold tap on and adjust to get the desired shower temperature WARNING YOU MUST REGULARLY INSPECT THE SHOWER HOSE FOR WEAR AND DAMAGE REPLACE IF NECESSARY OR EVERY TWO YEARS WITH OUR APPROVED PART WARNING IN ORDER TO MAINTAIN THE PERFORMANCE OF YOUR SHOWER YOU MUST DE...

Страница 8: ...shed do not switch off the power if you are going to use the unit again shortly Shower Check that the power is switched on at the mains local isolator switch Turn on the hot or flow tap FULLY diagram 9 If the unit has been used recently run the water through for a few seconds to let the temperature settle down we advise you DO NOT enter the water flow during this time WARNING YOU MAY INITIALLY GET...

Страница 9: ... the thermal cut out is operating A second outlet has been turned on Increase the supply water flow Make sure that the service valve is correctly adjusted Do not use the basin whilst using the shower Shower spray pattern deteriorates The shower handset is clogged Clean the handset using a descaling solution if required see page 9 We offer a technical advisory service on the telephone to installers...

Страница 10: ...n supply to the INLET marked in blue Use a pump to boost the supply from a storage tank Reset it by opening the unit and pushing the button on the cut out diagram 11 Before you do this you must remove the cause of the problem Contact Heatstore Water too cold neon light on The power select screw is set to LO One element is not working The Power Supply Voltage has dropped Change the power select scr...

Страница 11: ...s means that with the 12 0kW unit you can shower at 39 C with a flow rate of 5 litres minute in the middle of winter The unit includes a dual thermal cut out diagram 11 which is attached to the heat exchanger tube It will switch off the heater elements if the water flow is reduced too much and the temperature goes above a set limit The first stage cut out is cyclic and will automatically reset as ...

Страница 12: ... NOT cover damage or defects arising from poor or incorrect installation improper use or lack of maintenance including the build up of limescale The unit MUST NOT be fitted to any type of thermostatic mixer valve or tap The unit MUST NOT be fitted to a bath or kitchen sink other than for hand washing purposes It is the responsibility of the installer to check that the installation parameters meet ...

Отзывы: