Heatrae Sadia STREAMLINE OVERSINK 95010281 Скачать руководство пользователя страница 7

7

3.3 FIXING

Mark the position of the Streamline and the position of the fixing bracket 

1. 

(see figure 2).

Fix  the  wall  bracket  using  the  two  larger  fixing  plugs  and  screws 

2. 

provided

Remove the cover of the Streamline by removing the two screws from the 

3. 

bottom face and rotating the cover about the top edge.

Hang the Streamline on the wall bracket, and mark the position of the 

4. 

fixing hole (see figure 2)

Remove the Streamline from the bracket, drill the third fixing hole, and fit 

5. 

the third (smallest) fixing plug.

Hang the Streamline on the wall bracket again and fix securely with the 

6. 

third (smallest) fixing screw provided.

3.4 PLUMBING

Plumb the Streamline direct to the cold water main using 15mm diameter 

1. 

copper or plastic pipe. Water pressure should be no lower than 0.034MPa 

(0.34bar) and no higher than 1.0MPa (10bar) (see figure 6 overleaf).

Fit  the  flow  restrictor  (supplied)  in  the  incoming  supply  (see  Figure  6 

2. 

overleaf).

The inlet connection of the Streamline Oversink is an internal 15mm push 

3. 

fit elbow. Fit the incoming supply pipe through the grommet (snapped to 

the back plate) and in to the push fit elbow. Ensure the grommet is re-

seated.

NOTE: It is recommended that a WRAS listed isolating valve (not supplied) 

is fitted in the cold water supply to the Streamline for servicing. 

FIGURE 05 - FLOW RESTRICTOR

INLET

OUTLET

Содержание STREAMLINE OVERSINK 95010281

Страница 1: ...1 STREAMLINE OVERSINK Fitting Instructions and User Guide...

Страница 2: ...CATIONS 4 3 0 INSTALLATION 6 4 0 COMMISSIONING 10 5 0 EXPLANATION TO USER 11 6 0 MAINTENANCE 12 7 0 FAULT FINDING 14 8 0 SPARE PARTS 15 9 0 GUARANTEE 17 10 0 ENVIRONMENTAL INFORMATION 17 11 0 COMMISSI...

Страница 3: ...o the user and these instructions left with them for future reference The Streamline is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack...

Страница 4: ...g full Weight 10 Litre 4 0Kg empty 14 0Kg full Enclosure rated IPX4 Operating Pressure 0 MPa 0 bar TABLE 01 PERFORMANCE DATA MODEL HEAT UP MINUTES HEAT LOSS kWhr 24hr 7 Litre 1kW 25 0 5 7 Litre 3kW 9...

Страница 5: ...5 A 346 R276 4 32 5 50 18 5 70 290 471 74 450 500 213 FIGURE 02 DIMENSIONS IN mm THIRD FIXING HOLE DIMENSION A 7 LITRE 10 LITRE 278 178 17...

Страница 6: ...ied The water inlet connection must always be at the bottom of the Streamline Oversink Water Heater on the right side 3 2 LOCATION Ensure that the wall can support the full weight of the Streamline an...

Страница 7: ...d fix securely with the 6 third smallest fixing screw provided 3 4 PLUMBING Plumb the Streamline direct to the cold water main using 15mm diameter 1 copper or plastic pipe Water pressure should be no...

Страница 8: ...re the spout clamp ribs engage with the spout 4 and hold it securely in place Tighten the 1 2 BSP nut 5 Ensure the grommet is re seated snapped to the backplate 6 Fit the spout front to the spout body...

Страница 9: ...eparation of at least 3mm 2 in each pole must be incorporated in the supply The Streamline must be fitted with a 3 core 1 5mm 3 2 flexible cable The cable must be fitted through the cable gland and co...

Страница 10: ...trol knob is engaged with the 8 control valve extension and snaps to the front cover Set the temperature 9 The maximum setting is 70 C and the minimum is 5 C Rotate the thermostat knob clockwise to in...

Страница 11: ...ausing 3 the tap to drip This is normal and is not a fault with the Streamline 5 2 SYSTEM MALFUNCTION Explain how to isolate electrical and water supplies in case of a fault 1 Explain that a qualified...

Страница 12: ...operation 6 1 DRAIN THE STREAMLINE Ensure the water and power supplies to the Streamline are switched off 1 and the water is cold Remove the thermostat knob use a medium sized flat bladed screwdriver...

Страница 13: ...ect alignment Refit the locknut rotate the locknut clockwise until the EPA is held 7 securely in place NOTE When tight one of the locknut spokes should be at 9 O Clock and central to the live and neut...

Страница 14: ...ed on Check supply and turn on Insufficient mains pressure Check supply Blockage in tap Clean tap No hot water No water in heater Fill water heater Cut out has operated Reset cut out Faulty thermostat...

Страница 15: ...ck of 10 95611018 4 EPA Locknut 95607617 5 7 Litre Inner Container 95608028 6 10 Litre Inner Container 95608029 7 Drain Plug with O ring 95608929 8 Drain Plug O Ring pack of 10 95611017 9 Thermostat 9...

Страница 16: ...16 FIGURE 15 SPARE PARTS 9 10 11 12 5 3 1 4 18 7 19 15 17...

Страница 17: ...pered with and has been regularly 3 maintained The Streamline has been used only for heating potable water 4 The Streamline is not guaranteed against damage by frost or due to the build up of scale Pl...

Страница 18: ...er Electrical ________________________________________ Contact Details ____________________________________________ Competency Scheme ID Number _________________________ Comments _____________________...

Страница 19: ..._____________ ________________________________________________ ________________________________________________ Service Date _______________________________________________ Engineer __________________...

Страница 20: ...s 9 10 Hexagon Business Centre Springfield Road Hayes Middlesex UB40 0TY Tel 020 8606 3567 Parts Center Tel 0845 2709800 www partscenter co uk Newey Eyre Specialist Products Division Please contact yo...

Отзывы: