15

Discharge
It is a requirement of Building Regulation G3 that any 
discharge from an unvented system is conveyed to 
where it is visible, but will not cause danger to persons in 
or about the building. The tundish and discharge pipes 
should be fitted in accordance with the requirements 
and guidance notes of Building Regulation G3. The 
G3 Requirements and Guidance section 3.50 - 3.63 are 
reproduced in the following sections of this manual. 
For discharge pipe arrangements not covered by G3 
Guidance advice should be sought from your local 
Building Control Officer. Any discharge pipe connected 
to the pressure relief devices (expansion valve and 
temperature/pressure relief valve) must be installed in 
a continuously downward direction and in a frost free 
environment.

Water may drip from the discharge pipe of the 
pressure relief device. This pipe must be left open to 
the atmosphere. The pressure relief device is to be 
operated regularly to remove lime deposits and to 
verify that it is not blocked.

G3 REQUIREMENT

“...there shall be precautions...to ensure that the hot 
water discharged from safety devices is safely conveyed 
to where it is visible but will not cause danger to persons 
in or about the building.”

The following extract is taken from the latest G3 
Regulations

Discharge pipes from safety devices

Discharge pipe D1

3.50  Each of the temperature relief valves or combined 
temperature and pressure relief valves specified in 3.13 
or 3.17 should discharge either directly or by way of 
a manifold via a short length of metal pipe (D1) to a 
tundish.

3.51 The diameter of discharge pipe (D1) should be 
not less than the nominal outlet size of the temperature 
relief valve.

3.52 Where a manifold is used it should be sized to 
accept and discharge the total discharge from the 
discharge pipes connected to it.

3.53 Where valves other than the temperature and 
pressure relief valve from a single unvented hot water 
system discharge by way of the same manifold that 
is used by the safety devices, the manifold should be 
factory fitted as part of the hot water storage system 
unit or package.

Tundish

3.54 The tundish should be vertical, located in the 
same space as the unvented hot water storage system 
and be fitted as close as possible to, and lower than, 
the valve, with no more than 600mm of pipe between 

the valve outlet and the tundish (see fig 10).

Note: To comply with the Water Supply (Water Fittings) 
Regulations, the tundish should incorporate a suitable 
air gap.

3.55 Any discharge should be visible at the tundish.  
In addition, where discharges from safety devices may 
not be apparent, e.g. in dwellings occupied by people 
with impaired vision or mobility, consideration should 
be given to the installation of a suitable safety device 
to warn when discharge takes place, e.g. electronically 
operated.

Discharge pipe D2

3.56 The discharge pipe (D2) from the tundish should:

(a)  have a vertical section of pipe at least 300mm 
long below the tundish before any elbows or bends in 
the pipework (see fig. 10);  and
(b)  be installed with a continuous fall thereafter of at 
least 1 in 200.

3.57 The discharge pipe (D2) should be made of:
(a)  metal; or
(b)  other material that has been demonstrated to 
be capable of safely withstanding temperatures of 
the water discharged and is clearly and permanently 
marked to identify the product and performance 
standard (e.g. as specified in the relevant part of BS 
7291).

3.58 The discharge pipe (D2) should be at least one 
pipe size larger than the nominal outlet size of the 
safety device unless its total equivalent hydraulic 
resistance exceeds that of a straight pipe 9m long, 
i.e. for discharge pipes between 9m and 18m the 
equivalent resistance length should be at least two 
sizes larger than the nominal outlet size of the safety 
device; between 18 and 27m at least 3 sizes larger, and 
so on; bends must be taken into account in calculating 
the flow resistance.  See Fig 10, Table 5 and the worked 
example.

Note: An alternative approach for sizing discharge 
pipes would be to follow Annex D, section D.2 of BS 
6700:2006 Specification for design, installation, testing  
and maintenance of services supplying water for 
domestic use within buildings and their curtilages.

3.59 Where a single common discharge pipe serves 
more than one system, it should be at least one pipe 
size larger than the largest individual discharge pipe 
(D2) to be connected.

3.60 The discharge pipe should not be connected to a 
soil discharge stack unless it can be demonstrated that 
the soil discharge stack is capable of safely withstanding 
temperatures of the water discharged, in which case, it 
should:

(a)  contain a mechanical seal, not incorporating a 
water trap, which allows water into the branch pipe 

Содержание PremierPlus

Страница 1: ...PremierPlus Unvented Hot Water Cylinder Installation and User Manual...

Страница 2: ...ntenance operations 21 10 Troubleshooting 22 10 1 Fault finding 22 11 Decommissioning 23 11 1 Decommissioning procedure 23 12 1 Spare parts list 23 Benchmark checklist 25 Commissioning service records...

Страница 3: ...appliance Faulty or insufficient maintenance of the appliance Failure to abide by the instructions on installing the product Installer s liability The installer is responsible for the installation and...

Страница 4: ...and the mains water supply Do not switch on if there is a possibility that the water in the cylinder is frozen DANGER This cylinder is unvented and as such becomes pressurisedwheninoperation Thecombin...

Страница 5: ...ssure 1 6MPa 16 bar Max design pressure 0 8MPa 8 bar Max operating pressure PRV 0 35MPa 3 5 bar Expansion relief valve setting 0 6MPa 6 bar T P valve setting 1 0MPa 10 bar 90 C Maximum primary pressur...

Страница 6: ...199 246 295 295 355 355 Weight empty kg 23 25 28 29 36 45 45 55 55 Max supply pressure 1 6MPa 16 bar Max design pressure 0 8MPa 8 bar Max operating pressure PRV 0 35MPa 3 5 bar Max expansion vessel c...

Страница 7: ...170E 210E 250E 300E B 306 306 306 306 306 306 306 C 493 616 800 925 1184 1437 1751 D 784 906 1090 1216 1474 1726 2040 Item 100B 120B 150B 170B 210B 250B 300B A 315 315 315 315 315 315 315 B 354 354 35...

Страница 8: ...s with controls selected A double pole isolating switch must be installed in the mains supply All earth connections must be connected back to the mains earth supply 3 DHW OFF 2 3 L 1 N 2 3 HTG ON DHW...

Страница 9: ...3 Control Housing Details Element Connections 1 5mm 3 Core HOFR sheathed cable Indirect control wiring N L 1 5mm 3 Core HOFR sheathed cable Figure 5 Direct wiring schematic Figure 4 Indirect wiring s...

Страница 10: ...ions as listed below Building Regulations G3 The Building Standards Scotland The Building Regulations Northern Ireland I E E Electrical Regs UK Water Regulations 5 1 Installation regulations 5 2 Insta...

Страница 11: ...r supplies that have either inadequate pressure or where the supply may be intermittent Situations where it is not possible to safely pipe away any discharge from the safety valves In areas where the...

Страница 12: ...connection if required Cold water combination valve Mains water supply Isolating valve not supplied Discharge pipe Tundish Drain cock not supplied Secondary return if required use swept tee Inlet NOTE...

Страница 13: ...d with the discharge pipework in either the horizontal position or facing downwards Where discharge pipework is difficult to attain the local building control officer from the local council should be...

Страница 14: ...onze circulation pump will be required On large systems due to the increase in system water content it may be necessary to fit an additional expansion vessel to the secondary circuit This should be do...

Страница 15: ...nd lower than the valve with no more than 600mm of pipe between the valve outlet and the tundish see fig 10 Note To comply with the Water Supply Water Fittings Regulations the tundish should incorpora...

Страница 16: ...e continuously marked with a warning that no sanitary appliances should be connected to the pipe Note 1 Plastic pipes should be joined and assembled with fittings appropriate to the circumstances in w...

Страница 17: ...p to 27m 1 4m 1 7m 2 3m Table 5 Sizing of copper discharge pipe D2 for common temperature relief valve outlet sizes Safety device e g Temperature relief valve Metal discharge pipe D1 from Temperature...

Страница 18: ...e unit within the central heating system Other controls will be necessary to control the space heating requirements and times that the system is required to function The cylinder is compatible with mo...

Страница 19: ...hermostat s and that no water has discharged from the expansion relief valve or temperature pressure relief valve during the heating cycle Indirect units Fill the indirect primary circuit following th...

Страница 20: ...direct units immersion heater s All immersion heaters are fitted with a combined thermostat and thermal cut out located under the terminal cover mounted on the side of the product Access to the therm...

Страница 21: ...ply and turn off boiler Attachahosepipetothedraincockhavingsufficient length to take water to a suitable discharge point below the level of the unit Open a hot tap close to the unit and open drain coc...

Страница 22: ...rect thermostat Indirect motorised valve not connected correctly Check wiring and or plumbing connections to motorised valve Water discharges from expansion valve Intermittently Expansion vessel charg...

Страница 23: ...Pressure reducing valve cartridge 3 5 bar 95605898 11 Temperature Pressure Relief Valve 95605810 12 Expansion vessel 12 litre 100 120 and 150 litre models not shown 95607863 13 Expansion vessel 18 lit...

Страница 24: ...ure 12 Exploded view of cold water combination valve Cold Mains Connection 22mm Outlet Connection 22mm Outlet Connection 15mm 9 10 7 8 4 3 17 11 20 17 18 1 19 3 4 2 22 22 23 Figure 13 Cylinder explode...

Страница 25: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Страница 26: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Страница 27: ...subjected to frost nor has it been tampered with or been subject to misuse or neglect No factory fitted parts have been removed for un authorised repair or replacement The Benchmark commisioning chec...

Страница 28: ...te responsibility and sustainability charters and reduce our printed material we encourage you to download product brochures from our website In designing these files we have taken into account the ne...

Отзывы: