Heatilator Eco Choice PS50 Скачать руководство пользователя страница 18

18

December 9, 2019

7059-801D

HEATILATOR ECO CHOICE PS50

Locknut

Door Cross Section 

(example)

Latch Cam

Spacing 

Washers

Square Key

Door Handle

Spring 

Handle

Figure 18.1

8.  Soot and Fly Ash: Formation & Need for Removal in 

Exhaust Venting System.

•  Frequency:

 Yearly or more frequently depending on 

ash build-up.

•  By:

 Qualified Service Technician/Homeowner

Be sure the appliance is allowed to cool, has been 

unplugged and the exhaust blower is off.

The products of combustion will contain small particles 

of fly ash. The fly ash will collect in the exhaust venting 

system and restrict the flow of the flue gases.

At start-up if there is incomplete combustion, or if there is 

a shutdown or incorrect operation of the appliance it will 

lead to some soot formation. This will collect in the exhaust 

venting system.

The venting (chimney) system may need to be cleaned at 

least once a year or more often depending upon the quality 

of your fuel or if there are any horizontal pipe sections. 

Ash will build up more quickly in the horizontal sections 

and elbows.

9.  Door Handle Inspection

•  Frequency:

 Monthly or prior to heating season

•  By:

 Homeowner

The gasket between the glass and firebox should be 

inspected periodically to make sure there is a good seal. 

Check door handle for smooth cam operation.

10. Cleaning the Glass

•  Frequency:

 When clear view of the fire pot 

becomes obscure

•  By:

 Homeowner

a.  Appliance must be completely cool before 

cleaning glass.

b. 

Vacuum fly ash from glass and door rope.

c.  Use a damp paper towel or any non-abrasive glass 

cleaner. Wipe off with dry towel.

11.  Cleaning Exhaust Blower - Requires No Lubrication

•  Frequency:

 Yearly or more frequently depending on 

ash build-up

•  By:

 Homeowner or Qualified Service Technician

a.  Be sure the appliance is allowed to cool, has been 

unplugged and the exhaust blower is off.

b. 

Follow the directions for cleaning the exhaust path 

found on page 15.

c.  If unable to thoroughly clean the blower through 

this access, then follow the directions on page 22 

for direct access to the exhaust blower.

d.  Vacuum the blower’s impellers. Use care not to 

bend or damage the blower fins.

NOTE:

 Hearth & Home Technologies recommends to 

use a heavy duty vacuum cleaners specifically 

designed for solid fuel appliance cleaning.

Handle glass assembly with care.

When cleaning glass:

•  Avoid striking, scratching or 

slamming glass.

• 

Do NOT clean glass when hot.

• 

Do NOT use abrasive cleaners.

•  Refer to maintenance instructions.

CAUTION

Handle glass with care.

•  Inspect the gasket to ensure it is 

undamaged.

• 

Do NOT strike, slam or scratch glass.

• 

Do NOT operate appliance with glass 

assembly removed. 

WARNING

Содержание Eco Choice PS50

Страница 1: ...gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance Do not over fire If appliance or chimney connector glows you are over firing Over firing will void your w...

Страница 2: ...au dessus de la temp rature de la pi ce le po le s allumera automatiquement Pour teindre descendre la temp rature du thermostat en dessous de la temp rature de la pi ce Pour des instructions suppl me...

Страница 3: ...cedure 15 B Quick Reference Maintenance Chart 15 C General Maintenance 16 D High Ash Fuel Content Maintenance 20 E Soot or Creosote Fire 20 4 Troubleshooting Guide 21 5 Service Parts Replacement 24 A...

Страница 4: ...the verified purchase price of the product itself The maximum amount recoverable under this warranty is limited to the purchaser price of the product This warranty is subject to conditions exclusions...

Страница 5: ...caused by tightly sealed constructions insufficient make up air supply or handling devices such as exhaust fans or forced air furnaces or other such causes 6 use of fuels other than those specified in...

Страница 6: ...er cord into the wall receptacle Turn the thermostat on Turn the thermostat to off If the feed tube is empty or this is the first fire add a handful of pellets to the firepot Do not add extra fuel to...

Страница 7: ...per hr BTU Input 13 100 to 49 900 per hr Vent Size 3 or 4 inches L or PL Hopper Capacity 83 bs Fuel Premium Wood Pellets Weighted average LHV Low Heating Value efficiency using data collected during...

Страница 8: ...cts of combustion of such fuels can expose you to chemicals including carbon black which is known to the State of California to cause cancer and carbon monoxide which is known to the State of Californ...

Страница 9: ...aterial which will not ignite and burn composed of any combination of the following Steel Plaster Brick Iron Concrete Tile Glass Slate Materials reported as passing ASTM E 136 Standard Test Method for...

Страница 10: ...inal sealed bag until using to prevent moisture absorption This will also prevent rodents from becoming a problem Do not store any pellet fuel within the clearance requirements or in an area that woul...

Страница 11: ...ted on the back of the appliance in the upper left corner Figure 8 1 on page 8 4 Turn it to the high setting by pushing the top of the control switch in and then adjust the thermostat to its highest s...

Страница 12: ...me height or push down to decrease the feed rate and flame height 3 Re tighten the thumb screw A new stove has a break in period The fire characteristics should be checked again after 5 bags of pellet...

Страница 13: ...The appliance comes standard with a wall thermostat and 25 of wire If you need to run more than 25 make sure you use a continuous strand of 18 to 22 gauge thermostat wire For optimum performance your...

Страница 14: ...irty over time See General Maintenance Cleaning under Maintaining Servicing Appliance in the owner s manual No form of lubrication should ever need applied to the blowers Why are different components...

Страница 15: ...f trouble free service Contact your dealer to answer question regarding proper operation troubleshooting and service for your appliance Visit www heatilatorecochoice com Customer Care to view basic tr...

Страница 16: ...s built up on the bottom plate of the firepot and to push out any clinkers while in the open position d To close the firepot floor slightly raise the cleaning rod and then push it back into place If y...

Страница 17: ...haust Path Baffles Drop Tube Frequency Monthly or every 25 bags or more frequently depending on ash build up By Homeowner a Appliance must be completely cool b Open the door and remove the center baff...

Страница 18: ...to make sure there is a good seal Check door handle for smooth cam operation 10 Cleaning the Glass Frequency When clear view of the fire pot becomes obscure By Homeowner a Appliance must be completely...

Страница 19: ...ower Requires No Lubrication Frequency Yearly or more frequently depending on Dust Dirt build up By Homeowner or Qualified Service Technician a Be sure the appliance is allowed to cool and has been un...

Страница 20: ...blish a routine for the fuel wood burner and firing technique Check daily for creosote build up until experience shows how often you need to clean to be safe Be aware that the hotter the fire the less...

Страница 21: ...Make sure front door is closed Replace control box Call light on No fire Partially burned fuel in fire pot Fire pot clean out plate not closed Fire pot is dirty missed ignition Check that fire pot cle...

Страница 22: ...sing loss of vacuum Empty hopper of fuel Use a wet dry vacuum cleaner to remove remaining fuel from hopper including feed tube Check feed chute for obstructions Loosen 2 screws and jiggle feed assembl...

Страница 23: ...system Remove stainless steel baffle from firebox to clean ash from on top of baffle Clean behind rear brick panels Change fuel brand to premium Check that fire pot clean out plate is fully closed Red...

Страница 24: ...ance Figure 24 2 6 Release blower wires from the nylon wire retainer if applicable This appliance has 1 black and 1 white wire coming from the blower 7 Remove the wing bolt and move the blower and hol...

Страница 25: ...e install in reverse Snap Disc 2 Fuel Delivery Interrupt 1 Turn down thermostat let appliance cool completely if running Then unplug appliance before servicing 2 Using 2 Phillips screwdriver 3 8 wrenc...

Страница 26: ...l the ash drawer and side panel and re connect the power E Baffle Removal Replace 1 Shut down the appliance by turning down the thermostat and let the appliance completely cool down 2 Remove the cente...

Страница 27: ...ad screw driver remove the 4 brackets and set aside Figure 27 1 3 Remove old glass and replace with the new glass 4 Re install the brackets using the same screws Glass Assembly 1 2 3 4 Remove the 4 br...

Страница 28: ...ustion air travels over the red hot igniter creating super heated air that ignites the pellets 10 Junction Box And Wiring Harness The junction box is located on the lower left side of the appliance be...

Страница 29: ...7 Snap Disc 2 Fuel Delivery Interrupt 175 F Snap disc 2 is located on the center of the convection plenum above the convection blower There is an orange and a black wire connected to it This snap disc...

Страница 30: ...on Blower LOCATED BEHIND LEFT SIDE PANELS Control Box Junction Box Red Call Light Fuse LOCATED BEHIND RIGHT SIDE PANELS Feed Motor Vacuum Switch Combustion Blower Power Outlet Terminal Block Center 2...

Страница 31: ...31 December 9 2019 7059 801D HEATILATOR ECO CHOICE PS50 C Maintenance and Service Log Date of Service Performed By Description of Service...

Страница 32: ...rvice Parts Beginning Manufacturing Date Mar 2019 Ending Manufacturing Date Active PS50 C Part number list on following page Free Standing Pellet Stove 12 19 1 2 4 5 6 7 3 8 9 10 14 15 16 12 13 11 17...

Страница 33: ...5 1 Glass Assembly SRV7058 015 Y 5 2 Rope Door 3 4 X 84 832 1680 Y Corner Tape 1 Ft SRV560 437 9 Gasket Glass Tape 3 4 X 1 8 5 Ft 832 0460 Y 5 3 Hinge Pin 1 2 Nickel SRV430 5320 5 4 Door Handle Assemb...

Страница 34: ...ide Qty 2 req SRV7059 153 16 Blower Convection SRV7000 108 Y 17 Wire Harness SRV7058 150 Y 18 Blower Retainer SRV7058 148 19 Control Board 3 Speed Eco Choice SRV7058 188 Y 20 Latch Backing Plate SRV70...

Страница 35: ...stat Mechanical 812 3760 Y Paint Touch Up 3 42 19905 Hose Vacuum 5 32 Id 3 Ft SRV240 0450 Y Hose Barb Assembly SRV229 0920 Reset Button Assembly SRV7000 040 Baffle Center Back SRV7058 166 Collar Offse...

Страница 36: ...rtant operating and maintenance instructions included Read understand and follow these instructions for safe installation and operation Leave this manual with party responsible for use and operation o...

Отзывы: