background image

Parallel Compressor Systems Installation & Operations Manual, October 2004  

17

Parallel Compressor Systems

Warning:  

It is illegal to knowingly vent or discharge 

any CFC’s and HCFC’s to the atmosphere. 

ALL CFC’s and HCFC’s must be reclaimed 

or recycled.

Leak Check

1.   To check the systems for leaks, leave all valves closed on 

suction, liquid and hot gas manifolds. The unit is shipped 

with a holding charge of dry nitrogen and should be leak 

free. Build up the pressure in each circuit to a maximum of 

150 psig dry nitrogen and check each individual circuit.

2.   After  each  circuit  has  been  checked,  open  all  valves 

to allow the pressure into the unit assembly. Check to 

be  sure pressure is throughout the assembly. Check all 

connections and accessories for leaks.

Evacuation

1.   After the system is leak checked, connect a good high 

vacuum pump with fresh oil to both the low and high 

side evacuation valves. Connections between the pump 

and  evacuation  valves  should  be  made  with  copper 

tubing or high vacuum hose having a diameter of at least 

3/8”. Evacuate the system to 1500 microns for the first 

evacuation. 

2.   After each evacuation, the vacuum should be broken by the 

introduction of refrigerant into the system. The refrigerant 

should  be  passed  through  a  drier  when  breaking  the 

vacuum until the pressure is brought up to 0 psig.

3.   Between  the  first  and  second  evacuation,  the  liquid 

filter driers and suction filters should be installed in each 

replaceable core shell. 

4.   A triple evacuation is recommended. The third and final 

evacuation should achieve a value of 500 microns or less. 

After this vacuum is reached, add as much refrigerant as 

possible into the receiver. Now the system is ready to be 

started.

Start-up

1.   Set all pressure controls as recommended elsewhere in this 

manual. Recheck all service valves and shut-off valves to 

be sure they are open. 

2.   Check and be sure the condenser fan motors are running 

in the correct rotation. 

3.   All evaporator fan motors should be checked for proper 

rotation. The fans in low temperature boxes generally have 

a fan delay for defrost purposes that keep the fans from 

operating until the evaporator coil has reached a certain 

temperature.  It  will  be  necessary  to  jump-out  the  fan 

controls on freezer units to make them run through final 

charging and room temperature pull-down. The wiring 

diagram for the unit will have to be consulted to determine 

how to best force the fans to operate for this step.

4.   With  all  compressor  and  control  breakers  and  toggle 

switches turned off, apply power to the unit. If the unit is 

using a phase monitor, the green light must come on before 

going any further. (See instructions for phase protector 

elsewhere in this manual.) A red light indicates incorrect 

phasing or voltage. Check with a volt meter to see if correct 

voltage is connected to the unit. Correct the Power Supply 

before proceeding.

5.   Turn on the circuit breaker for the control power. If an 

electronic control system is installed on the unit, it will 

initiate at this time. The Heatcraft preferred controller is 

manufactured by Computer Process Control (CPC). Review 

the manual for the controller supplied with the system.

6.   Turn on circuit breakers to all compressors. The compressors 

can  be  started  by  turning  on  the  compressor  toggle 

switches. Likewise, each circuit control can be started by 

turning on the circuit toggle switch. It is recommended that 

one compressor at a time be started and checked before 

allowing them all to operate. It is also advisable to check 

one circuit at a time to be certain all components work 

when called upon and that the circuit wiring is correct.

7.   When each circuit and compressor has been tested and 

the appropriate amount of refrigerant has been added for 

proper operation, allow the system to operate and pull-

down the room/fixture temperatures. 

8.   Once the system is operating, set all regulating valves.
9.   When  the  room  and/or  the  fixture  temperatures  are 

at  design,  the  expansion  valves  should  be  set.  (See 

instructions elsewhere in this manual.)

10.   Adjust  the  electronic  or  manual  pressure  controls 

as  necessary  to  maintain  proper  pressures  and 

temperatures.

11.   Check the refrigerant level in the receiver. The minimum 

level that should be maintained is 20%.

12.   All circuit defrost controls must be set and checked. Again, 

one circuit at a time should be tested.

13.  Set condenser fan controls to maintain the proper discharge 

pressure.

14.   All safety controls should be checked and verified. Check 

that the alarm circuitry is operating at this time. 

15.   Check the oil reservoir during the start-up and add oil as 

necessary. The oil level should be between the upper and 

lower reservoir sight glass. Do not add more than two 

gallons of oil to a system. If more oil is needed, recheck the 

piping as oil is not returning to the unit properly.

Leak Checking, Evacuation and Start-up

Содержание H-IM-PCS

Страница 1: ...Parallel Compressor Systems Bulletin No H IM PCS October 2004 Part Number 25000102 Replaces H IM 72B October 2004 Installation and Operation Manual...

Страница 2: ...peland Lubricants Carlyle Compressors Approved Carlyle Lubricants Oil Pressure Table 13 O6D E Oil Pressure History Table 14 Oil Safety Switch 22 Table 15 Part Load Performance Multipliers Table 16 Req...

Страница 3: ...tive and the carrier of the damage immediately Request an immediate joint inspection with the carrier Do not repair the unit until inspected by carrier s representative Care should be exercised when u...

Страница 4: ...es at the rear and 42 inches in the front of panel or as required by National or Local Codes For parallel system units placed end to end 24 inches between units is suggested Floor Foundation Requireme...

Страница 5: ...e ground level provides some protection from ground water and wind blown matter The concrete slab should be isolated from the building structure Finally before tightening mounting bolts recheck the le...

Страница 6: ...whenever possible Care should be taken to see that ample room is left for maintenance work through access doors and panels When the unit is in an area where it is enclosed by three walls the unit mus...

Страница 7: ...ment Before starting up a parallel unit insure that all fuses and motor protective devices are in place and that all wiring is secure A complete wiring diagram for troubleshooting the unit will be fou...

Страница 8: ...ed a maximum of 2 feet in each direction Pipingattachedtoavibratingobject suchasacompressor or compressor base must be supported in such a manner that will not restrict the movement of the vibrating o...

Страница 9: ...ially on hot gas lines to prevent line breakage This is critical on long straight runs of generally 70 or more where expansion loops must be provided and hangers should allow for longitudinal movement...

Страница 10: ...04A R 507 4 1 1 1 6 1 1 6 8 2 2 1 10 2 2 7 12 2 3 3 16 3 4 1 20 4 5 6 30 6 8 3 40 8 11 8 Table 2 Pressure Loss of Liquid Refrigerants In Liquid Line Risers Expressed in Pressure Drop PSIG and Subcooli...

Страница 11: ...2 57 3 50 4 98 14 27 40 26 42 58 40 64 95 61 93 1 32 1 91 1 33 1 87 1 5 8 12 134A 22 R 507 502 404A 90 9 90 0 78 0 3 65 4 96 7 07 20 37 56 37 59 82 57 90 1 35 87 1 33 1 86 1 30 1 88 2 64 2 1 8 12 134...

Страница 12: ...8 2 1 8 1 3 8 1 3 8 1 5 8 1 5 8 1 5 8 2 1 8 1 3 8 1 5 8 1 5 8 1 5 8 1 5 8 2 1 8 1 5 8 1 5 8 1 5 8 84 000 1 1 8 1 3 8 1 5 8 1 5 8 1 5 8 2 1 8 1 3 8 1 3 8 1 5 8 1 5 8 2 1 8 2 1 8 1 3 8 1 5 8 1 5 8 1 5 8...

Страница 13: ...8 5 8 5 8 72 000 1 5 8 2 1 8 2 1 8 1 5 8 1 5 8 1 5 8 1 5 8 2 1 8 2 1 8 1 5 8 1 5 8 1 5 8 1 5 8 2 1 8 2 1 8 5 8 5 8 5 8 5 8 5 8 7 8 78 000 2 1 8 2 1 8 2 1 8 1 5 8 1 5 8 1 5 8 2 1 8 2 1 8 2 1 8 1 5 8 1...

Страница 14: ...1 5 8 1 5 8 1 1 8 1 3 8 1 5 8 1 5 8 1 5 8 2 1 8 1 3 8 1 3 8 1 5 8 84 000 1 1 8 1 1 8 1 3 8 1 3 8 1 3 8 1 5 8 1 1 8 1 3 8 1 3 8 1 3 8 1 5 8 1 5 8 1 3 8 1 3 8 1 5 8 1 5 8 1 5 8 2 1 8 1 3 8 1 5 8 1 5 8...

Страница 15: ...5 8 5 8 72 000 1 5 8 2 1 8 2 1 8 1 3 8 1 5 8 1 5 8 1 5 8 2 1 8 2 1 8 1 3 8 1 5 8 1 5 8 2 1 8 2 1 8 2 1 8 1 2 1 2 5 8 5 8 5 8 7 8 78 000 1 5 8 2 1 8 2 1 8 1 3 8 1 5 8 1 5 8 2 1 8 2 1 8 2 1 8 1 3 8 1 5...

Страница 16: ...1 8 1 3 8 1 1 8 1 1 8 180 000 50 100 1 5 8 2 1 8 1 3 8 1 3 8 1 3 8 1 3 8 1 3 8 1 3 8 1 3 8 1 5 8 1 3 8 1 3 8 1 3 8 1 5 8 1 3 8 1 3 8 240 000 50 100 1 5 8 2 1 8 1 5 8 1 5 8 1 5 8 1 5 8 1 3 8 1 3 8 1 5...

Страница 17: ...e pull down The wiring diagramfortheunitwillhavetobeconsultedtodetermine how to best force the fans to operate for this step 4 With all compressor and control breakers and toggle switches turned off a...

Страница 18: ...eturned into the liquid manifold the Priority I design returns the liquid to the condenser through a liquid drain manifold Hot discharge gas is injected into the suction line at the parallel rack and...

Страница 19: ...igerant being returned to the compressor This will cause dilution of the oil and eventual failure of the bearings and piston rings In extreme cases the compressor will fail as a result of the diluted...

Страница 20: ...est The compressors are solid mounted to a base frame or mounted on the refrigerant receiver All reciprocating compressors incorporate oil floats Crankcase heaters will be installed and wired Cylinder...

Страница 21: ...1 24 to 1 8 18 to 34 1 24 to 2 3 Carlyle Compressors Approved Carlyle Lubricants For CFC and HCFC Refrigerants Use Totaline 150 Suniso 3GS Shrieve Zerol 150 Texaco WFI 32 150 IGI Petroleum Cryol 150...

Страница 22: ...eactivated after a specified trip delay The output relay reactivates after power line conditions return to an acceptable level for a specified amount of time Restart Delay The trip delay prevents nuis...

Страница 23: ...Vessel is exposed to excessive heat When a Vessel containing liquid refrigerant is shut off from otherpartsofthesystemariseintemperaturewillcausearisein pressure If theVessel is completely filled wit...

Страница 24: ...let 350 400 425 450 Angle 526E 3 8 MPT 3 8 FLARE 10 2 11 6 12 3 13 0 527E 1 2 MPT 5 8 FLARE 28 5 32 4 34 4 36 3 Straight Through 5231 3 8 MPT 3 8 FLARE 11 2 12 7 13 5 14 3 5231 A 3 8 MPT 1 2 FLARE 18...

Страница 25: ...cannot be reset until the pressure drops to a predetermined level The latching mechanism inside the manual reset model is trip free The electrical contacts will cutout even if the reset button is hel...

Страница 26: ...d to insure the system will work properly Low Pressure Oil System This type system is normally used for parallel compressors and uses three basic components Oil Separator Oil Reservoir and Oil Level R...

Страница 27: ...pressure expansion valve with a range of 0 to 90 psig Temprite Part No is 67070000 An alternative valve manufactured by Sporlan is Model ADRI 11 4 0 90 Oil Level Regulators The AC R adjustable oil re...

Страница 28: ...n the motor cavity on semi hermetic models the compressor will overfill The oil line sight glass is a good way to see how the separator is working Look for movement in the glass If the separator is no...

Страница 29: ...strainers and filter driers 3 Install a replacement compressor and make a complete electrical check 4 Make sure the suction line adjacent to the compressor is clean Install a liquid line filter drier...

Страница 30: ...r pressure The regulator closes as the condenser pressure drops below the set point thus back flooding the condenser and reducing the inside surface area available for condensing Valve B is and Outlet...

Страница 31: ...utdoor temperature to allow the system pressures to drop below the regulator pressure settings Before adjusting make sure that all manual opening stems on the regulators are set for automatic operatio...

Страница 32: ...0psig withonecompleteturnequal toapproximately4psichange Adjustmentsshouldbemade insmallincrements allowingforthesystemtostabilizeafter each turn 6 Vary the evaporator load to test at various conditio...

Страница 33: ...connections Checkoperationandconditionofcontactsoncompressor fan motor contactors Check appearance of control panel interior Check appearance of exterior conduit junction boxes Check appearance of ins...

Страница 34: ...tor Check stator If leads are all right replace stator Eliminate cause of excessive pressure Check oil level Correct binding Unit Operates Long Or Continuously 1 2 3 4 5 6 Control contacts sticking in...

Страница 35: ...ters Check and reset for proper superheat Check means for regulating condensing temperature Check for proper sizing Little or No Oil Pressure 1 2 3 4 5 6 7 8 9 Clogged suction oil strainer Excessive l...

Страница 36: ..._ Group __________________ Group _________________ Compressor Model Serial No __________________ __________________ Group __________________ Compressor Model Serial No __________________ _____________...

Отзывы: