33
Heat & Glo • HE36CLX-S • 2183-900 Rev. H • 1/14
G. Install Horizontal Termination Cap (CVP-HCK)
• Vent termination must not be recessed in the wall. Siding
may be brought to the edge of the cap base.
• Flash and seal as appropriate for siding material at
outside edges of cap.
• When installing a horizontal termination cap, follow
the cap location guidelines as prescribed by current
ANSI Z223.1
and
CAN/CGA-B149
installation codes
and refer to Section 6 of this manual.
CAUTION! Risk of Burns!
Local codes may require in-
stallation of a cap shield to prevent anything or anyone
from touching the hot cap.
CVP-HCK can adjust 9 inches (14 in. to 23 in.).
SLOTS ON BOTTOM
SIDE OF CAP.
NOTICE: When installing the horizontal termination
cap, ensure the slots are on the bottom of the cap.
Figure 10.15 CVP-HCK Orientation