![Heat&Glo HE36CLX-S Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/heatandglo/he36clx-s/he36clx-s_owners-manual_2116032031.webp)
31
Heat & Glo • HE36CLX-S • 2183-900 Rev. H • 1/14
E. Vertical Termination
• See minimum vent heights for various pitched roofs
(Figure 10.8) to determine the length of pipe to extend
through the roof.
Roof Pitch H (Min.) Ft.
Flat to 6/12........................................1.0*
Over 6/12 to 7/12 ............................1.25*
Over 7/12 to 8/12 ..............................1.5*
Over 8/12 to 9/12 ..............................2.0*
Over 9/12 to 10/12 ............................2.5*
Over 10/12 to 11/12 ......................... 3.25
Over 11/12 to 12/12 ........................... 4.0
Over 12/12 to 14/12 ........................... 5.0
Over 14/12 to 16/12 ........................... 6.0
Over 16/12 to 18/12 ........................... 7.0
Over 18/12 to 20/12 ........................... 7.5
Over 20/12 to 21/12 ........................... 8.0
* 3 foot minimum in snow regions
Figure 10.8 Minimum Height From Roof To Lowest Discharge
Opening
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT
TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT.
MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
NOTICE:
Failure to properly caulk the roof
fl
ashing and
pipe seams may permit entry of water.
• Caulk the gap between the roof
fl
ashing and the outside
diameter of the pipe. See Figure 10.10.
• Caulk the perimeter of the
fl
ashing where it contacts the
roof surface. See Figure 10.9.
• Caulk the overlap seam of any exposed pipe sections
that are located above the roof line. See Figure 10.12.
F. Install Storm Collar & Vertical Vent Cap
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
1. Slide plastic storm collar over metal roof
fl
ashing.
Collar can be rotated 180º to accommodate various
roof pitches.
Figure 10.9 Caulk Around Flashing
CAULK
CAULK
Figure 10.10 Caulk Around Metal/Plastic Seam
CAULK
CAULK
Figure 10.11 Vent Flange Installed on Storm Collar
VENT ASSEMBLY
VENT ASSEMBLY
COLLAR
COLLAR
FLANGE
FLANGE
2. Secure plastic storm collar to metal roof
fl
ashing with
the four screws provided. Caulk around all seams with
caulk with a minimum of 300ºF continuous exposure
rating. See Figure 10.9 and 10.10.
3. Slide vent assembly through the plastic storm collar
until the
fl
ange on the vent assembly rests on the storm
collar. See Figure 10.11.
4. Secure pipe to the interior roof with the roof clamp
provided. Caulk around the seam. See Figure 10.12,
Figure 10.13 and Figure 10.14 in reference to correct
installation.
Note:
CVP-VC can adjust 9 in. (14 in. to 23 in.).