BOILER INSPECTION AND MAINTENANCE SCHEDULE
Inspection Activities
Piping
1st Year
2nd Year
3rd Year
4th Year*
Near Heater Piping
Check heater and system piping for any sign of leakage, verify proper support
Vent
Check condition of all vent pipe and joints and supports. Note any deterioration and replace.
Gas
Check gas piping, test for gas leaks and signs of aging, make sure all pipes are supported properly.
Visual
Do a full visual inspection of all system components. Pay close attention to clearances of venting. Make
sure intake and exhaust screens are clean and clear of obstructions.
Functional
Test all functions of the system (Heat, Set Point, Safeties)
Temperatures
Verify safe settings on Super-Stor storage tank or Anti-Scald Valve (see part 12 for related safety
warnings)
Connections
Check wire connections, make sure they are tight
Circuit breakers
Check to see that the circuit breaker is clearly labeled, exercise circuit breaker
Switch and Plug
Verify ON/OFF switch and convenience plug are both functional
Smoke and CO detector
Verify devices are installed and working properly, change batteries if necessary
Combustion Chamber
Vacuum Debris from Combustion Chamber if Necessary
Combustion Chamber
Check burner tube, and combustion chamber coils, clean according to maintenance section of manual.
See procedure to clean heat exchanger Part 13.
Spark Electrode
Clean with Scotch Brite pad, Set gap at 1/4" (see Fig 14-2 Part 14 in Troubleshooting section)
Flame Probe
Clean with Scotch Brite pad, Check flame current in
μ
A (d7 on status menu in Start-up Procedures)
record high fire (7-9 typical) and low fire (2-6 typical)
* NOTE : CONTINUE MAINTENANCE BEYOND THE 4TH YEAR IS REQUIRED ON A YEARLY BASIS.
Date last completed
System
Electrical
Chamber and Burner
GAS-FIRED HOT WATER SUPPLY BOILER
Boiler Manual
72
Содержание MODCON VWH 300 HL
Страница 23: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 22 ...
Страница 24: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 23 ...
Страница 25: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 24 ...
Страница 26: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 25 ...
Страница 28: ...27 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual PART 5 BOILER PIPING CONTINUED ...
Страница 52: ...PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 255 Rev 11 09 09 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 51 ...
Страница 75: ...LP 172 REV 2 16 06 74 ...
Страница 76: ...LP 172 REV 2 16 06 75 ...
Страница 77: ...MAINTENANCE NOTES 76 ...
Страница 78: ...MAINTENANCE NOTES 77 ...
Страница 79: ...MAINTENANCE NOTES 78 ...
Страница 80: ... 2003 2009 Heat Transfer Products Inc www HTproducts com LP 276 REV 11 25 09 ...