PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL
(CONTINUED)
CLEAN OUT PORT
PIPING/FITTINGS
3/4" SWEAT PVC
3/4" SWEAT PVC TEE
ASSEMBLIES FOR
SUPPORT
WITH A PITCH OF 1/4" PER FOOT
HORIZONTAL LINES MUST BE INSTALLED
CONDENSATE PUMP
NEUTRALIZER
OPEN TO ATMOSPHERE
CONDENSATE NEUTRALIZER
WITH PUMP
PIPE HANGER
CONDENSATE
PIPE SUPPORT
CAUTION
The condensate line must remain unobstructed,
allowing free flow of condensate. If condensate
is allowed to freeze in the line or if the line is
obstructed in any other manor, condensate can
exit from the boiler tee, resulting in potential
water damage to property.
NOTICE
When installing a condensate pump, select one
approved for use with condensing boilers and
furnaces. The pump should have an overflow
switch to prevent property damage from
condensate spillage.
Condensate from the Mod Con Boiler will be
slightly acidic (typically with a pH from 3.2 to
4.5). Install a neutralizing filter if required by
local codes.
3,3(+$1*(5
$66(0%/,(6
)256833257
)/225'5$,1
39&6:($7
3,3,1*),77,1*6
+25,=217$//,1(6
0867%(,167$//(':,7+
$3,7&+2)3(5)227
&/($12873257
6:($739&7((
23(172$70263+(5(
&21'(16$7(
1(875$/,=(5
&21'(16$7(1(875$/,=(5
:,7+2873803
3,3(6833257
Fig. 6-1
Fig. 6-2
LP-205-W Rev. 5/14/08
NOTE: TO CLEAN OUT CONDENSATE
COLLECTOR ;USE A WET VAC INSIDE
THE OPEN PORT TO THE CONDENSATE
COLLECTOR. THIS WILL HELP REMOVE
ANY FOREIGN MATTER THAT MAY BLOCK
THE CONDENSATE LINE.
OVERFLOW SWITCH
CONDENSATE
CONDENSATE CAP
LP-205-ZZ Rev. 2/19/09
n
WARNING
When servicing is complete, you must
make sure the cap is replaced securely.
Failure to do so will cause venting issue
that will result in serious injury or death.
GAS-FIRED HOT WATER SUPPLY BOILER
Boiler Manual
32
Содержание MODCON VWH 300 HL
Страница 23: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 22 ...
Страница 24: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 23 ...
Страница 25: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 24 ...
Страница 26: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 25 ...
Страница 28: ...27 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual PART 5 BOILER PIPING CONTINUED ...
Страница 52: ...PART 8 FIELD WIRING CONTINUED Fig 8 5 LP 255 Rev 11 09 09 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 51 ...
Страница 75: ...LP 172 REV 2 16 06 74 ...
Страница 76: ...LP 172 REV 2 16 06 75 ...
Страница 77: ...MAINTENANCE NOTES 76 ...
Страница 78: ...MAINTENANCE NOTES 77 ...
Страница 79: ...MAINTENANCE NOTES 78 ...
Страница 80: ... 2003 2009 Heat Transfer Products Inc www HTproducts com LP 276 REV 11 25 09 ...