)NSTALLINGTHE3TOVE
CONTINUED
)NSTALLATION
SUITE
&OR6ERTICAL2UNS
/NECEILINGlRESTOPIS
2%15)2%$
AT THE HOLE IN EACH CEILING THROUGH WHICH THE VENT
PASSES
4OINSTALLlRESTOPSFORVERTICALRUNSTHATPASSTHROUGH
CEILINGS
s 0OSITION A PLUMB BOB DIRECTLY OVER THE CENTER OF
THEVERTICALVENTCOMPONENT
s -ARK THE CEILING TO ESTABLISH THE CENTERPOINT OF
THEVENT
s $RILLAHOLEORDRIVEANAILTHROUGHTHISCENTERPOINT
s #HECK THE mOOR ABOVE FOR ANY OBSTRUCTIONS SUCH
ASWIRINGORPLUMBINGRUNS
s 2EPOSITION THE STOVE AND VENT SYSTEM IF NECES
SARY TO ACCOMMODATE THE CEILING JOISTS ANDOR
OBSTRUCTIONS
s #UTANvXvMM8MM HOLETHROUGH
THE CEILING USING THE CENTERPOINT PREVIOUSLY
MARKED
s &RAMETHEHOLEWITHFRAMINGLUMBERTHESAMESIZE
ASTHECEILINGJOISTS
&IGURE
vXv(OLEAND.EW
&RAMING-EMBERS
3ECTIONS VERTICALES
5N COUPEFEU DE PLAFOND EST
/",)'!4/)2%
AU TROU DE CHAQUE PLAFOND TRAVERS£
PARLECONDUIT
0OURPOSERDESCOUPEFEUDEPLAFOND
s 3USPENDRE UN lL Ü PLOMB AUDESSUS DU CENTRE
DUCONDUIT
s 4RACERSURLEPLAFONDUNREPáRECORRESPONDANTAU
CENTREDUCONDUIT
s 0ERCERUNTROUOUPLANTERUNCLOUSURLEREPáRE
s 3ASSURER QUIL NY A PAS DOBSTRUCTION DE LAUTRE
C¹T£ DU PLAFOND FILS £LECTRIQUES TUYAUX DE
PLOMBERIEETC
s 3IL LE FAUT REPOSITIONNER LAPPAREIL DE CHAUFFAGE
ETLESYSTáMEDEVENTILATIONPOURTENIRCOMPTEDES
SOLIVESDUPLAFONDOUDETOUTAUTREOBSTACLE
s ÃPARTIRDUREPáRETRAC£AUPLAFONDUTILIS£COMME
CENTRE D£COUPER UN TROU CARR£ DE MM X
MMINXIN
s %NCADRER LE TROU AVEC DES TASSEAUX DE MäMES
DIMENSIONSQUELESSOLIVESDUPLAFOND
./4%4HERE MUST
BE./).35,!4)/.
OR OTHER COMBUS
TIBLES INSIDE THE
FRAMED
lRESTOP
OPENING
./4%:)LNEDOITY
AVOIR!5#5.%)3/,!
4)/.OUDgAUTRECOM
BUSTIBLESÜLgINT£RIEUR
DELgOUVERTUREDElRE
STOPDRESS£E
CEILING
(PLAFOND)
NEW FRAMING
MEMBERS
(TASSEAUX
NEUFS)
CHIMNEY HOLE
(
TROU POUR
LE CONDUIT)
10 IN .
(254mm)
10 IN .
(254mm)
EXISTING
CEILING
JOISTS
(SOLIVES
DE LA CHARPENTE)
&IGURE
4ROUDEXMM
ETTASSEAUXDENCADREMENT