25
If the installation is for a termination cap attached
directly to the fireplace, skip to the sections,
Install
Firestops
and
Flue Termination
.
2. Continue Adding Flue Components
To continue adding flue components in accordance
with the pre-planned flue system configuration:
• Ensure that each succeeding flue component is
securely fitted and locked into the preceding
component in the flue system.
90° elbows may be installed and rotated to any point
around the preceding component’s vertical axis. If
an elbow does not end up in a locked position with
the preceding component, attach with a minimum of
two (2) sheet metal screws.
Continue adding flue components, locking each
succeeding component into place.
Figure 17. Adding Flueing Components
3. Install Support Brackets
For Horizontal Runs -
The flue system must be
supported every 1.5m of horizontal run by a horizontal
pipe support.
To install support brackets for horizontal runs:
• Place the pipe supports around the flue pipe.
• Nail the pipe supports to the framing members.