
11
Figure 5.
Vent Components and Termination Kits
Step 3. Installing the Vent System
A. Vent System Approvals
This model is approved to use D-series direct vent compo-
nents and terminations (Figures 4 and 5). Approved vent
system components are labeled for identification. This pipe
is tested and listed as an approved component of the fire-
place. The pipe is tested to be run inside an enclosed wall.
There is no requirement for inspection openings at each
joint within the wall. There is no required pitch for horizontal
vent runs.
NO OTHER VENTING SYSTEMS OR COMPO-
NENTS MAY BE USED
.
Detailed installation instructions are included with each vent
termination kit and should be used in conjunction with this
Installers Guide
.
The flame and ember appearance may vary based on the type
of fuel burned and the venting configuration used.
Termination Kits
!
WARNING: A 3-FOOT LENGTH OF STRAIGHT
PIPE (MINIMUM) MUST BE THE FIRST VENT
COMPONENT ATTACHED TO THE UNIT.
Vent Components
Identifying Vent Components
The vent systems installed on this gas fireplace may in-
clude one, two or three 90°
elbow assemblies. The relation-
ships of vertical rise to horizontal run in vent configurations
using 90° elbows
MUST BE
strictly adhered to. The rise to
run relationships are shown in the venting drawings and
tables. Refer to the diagrams on the next several pages.
NOTE: Two 45° elbows may be used in place of one
90° elbow. Rise to run ratios in the vent system must
be followed if 45° elbows are used.
DVK-TVCD
DVK-01TRD
DVK-01D
VERTICAL
TERMINATION
HORIZONTAL
TERMINATION
WALL FIRESTOP
90 DEGREE ELBOW
CEILING FIRESTOP
WALL BRACKET
PIPE LENGTH
HORIZONTAL PIPE SUPPORT
ROOF FLASHING
STORM COLLAR
HEAT SHIELD