Heat-N-Glo AT-Supreme-C Скачать руководство пользователя страница 9

9

2

Getting Started

Introducing the

Heat-N-Glo Gas Appliances

Heat-N-Glo

 

direct vent gas appliances are designed to oper-

ate with all combustion air siphoned from outside of the build-

ing and all exhaust gases expelled to the outside. The infor-

mation contained in this 

Installers Guide

, unless noted oth-

erwise, applies to all models and gas control systems. Gas

appliance diagrams, including the dimensions, are shown in

this section.

Pre-installation Preparation

This gas insert and its components are tested and safe when

installed in accordance with this 

Installers Guide

. Report to

your dealer any parts damaged in shipment, particularly the

condition of the glass. 

Do not install any unit with

damaged, incomplete, or substitute parts.

The vent system components and trim surrounds are shipped

in separate packages. The gas logs are  packaged separately

and must be field installed.  

Read all of the instructions

before starting the installation. Follow these instructions

carefully during the installation to ensure maximum

safety and benefit. Failure to follow these instructions

will void the owner’s warranty and may present a fire

hazard.

The Heat-N-Glo, a division of Hearth Technologies Inc.

Warranty will be voided by, and Heat-N-Glo disclaims any

responsibility for, the following actions:
• Installation of any damaged appliance or vent system

component.

• Modification of the appliance or direct vent system.
• Installation other than as instructed by Heat-N-Glo.
• Improper positioning of the gas logs or the glass door.
• Installation and/or use of any component part not manu-

factured and approved by Heat-N-Glo, not withstanding

any independent testing laboratory or other party approval

of such component part or accessory.

ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE HAZ-

ARD.
NOTE:

 The log grate has been secured to the top of the

firebox for shipment. Remove the log grate by unscrewing

the brackets before proceeding with your installation.

Comment débuter

Présentation des appareils à gaz

Heat-N-Glo

Les appareils à gaz à évacuation directe Heat-N-Glo

 

sont

conçus pour aspirer tout l’air de combustion de l’extérieur de

l’édifice et expulser tous les gaz de combustion en dehors

de l’édifice. Les informations contenues dans ce 

Guide

d’installation

, sauf dans le cas de mention contraire,

s’appliquent à tous les modèles et à tous les systèmes de

commande de gaz. Cette section comprend des schémas

de l’appareil à gaz, avec ses dimensions.

Préparation avant l’installation

Cette cassette à gaz et ses éléments ont été testés et ne

présentent aucun danger s’ils sont installés conformément

à ce 

Guide d’installation

. Signalez à votre concessionnaire

toutes pièces endommagées lors du transport, en particulier

s’il s’agit de la porte en verre. 

N’installez aucun appareil

dont des pièces sont endommagées, sont incomplètes

ou ont été remplacées par des pièces différentes.

Les éléments du système d’évacuation et les entourages

sont expédiés dans différents colis. Les bûches à gaz sont

emballées séparément et doivent être installées sur place.

Lisez toutes les instructions avant de commencer

l’installation. Suivez attentivement ces instructions

pendant l’installation afin d’assurer une sécurité et une

efficacité optimales. Si ces instructions ne sont pas

suivies, la garantie sera annulée et vous pourriez

causer un incendie.

La garantie Heat-N-Glo, division de Hearth Technologies Inc.,

sera annulée par les actes suivants, pour lesquels Heat-N-

Glo décline toute responsabilité :
• Installation d’éléments endommagés dans l’appareil ou

dans le système d’évacuation.

• Modification de l’appareil ou du système d’évacuation

directe.

• Installation différente de celle indiquée par Heat-N-Glo.
• Placement incorrect des bûches à gaz ou de la porte en

verre.

• Installation et/ou utilisation de pièces n’ayant pas été

fabriquées et approuvées par Heat-N-Glo, même si cette

pièce ou cet accessoire a été homologué par un laboratoire

d’essais indépendant ou un autre organisme compétent.

CES ACTES POURRAIENT CAUSER UN INCENDIE.
REMARQUE :

 La grille a été fixée sur le haut du foyer pour

le transport. Retirez la grille en dévissant les supports avant

de commencer l’installation.

Содержание AT-Supreme-C

Страница 1: ...his appli ance is not convertible for use with other gases unless a certified kit is used 1 Cet appareil peut tre install dans un mobile home pr fabriqu qui a t vendu et ne sera plus d plac si les cod...

Страница 2: ...pour l inspection de l appareil et le remplacement de toute pi ce qui fut submerg e CET APPAREIL N EST PAS CON U POUR TRE UTILIS AVEC DES COMBUSTIBLES SOLIDES L installation et les r parations doiven...

Страница 3: ...D GAG de tout obstacle et mat riau afin d en permettre le service et le bon fonctionnement En raison de la temp rature lev e l appareil doit SE TROUVER en dehors des zones de passage et bonne distance...

Страница 4: ...e of Contents Consignes de s curit et mises en garde 2 Liste des pi ces de rechange 4 Section 1 Homologations et codes 7 Homologations et codes 7 Homologation de l appareil 7 Codes d installation 7 In...

Страница 5: ...G LP Exploded Parts Diagram AT SUPREME C GN PL Vue clat e des pi ces Part number list on following page La liste des num ros de pi ce se trouve la page suivante 1 4 3 5 Log Set Assembly 7 6 11 10 9 8...

Страница 6: ...2 Burner Orifice LP 51A Orifice de br leur PL 51A 438 803 3 Burner NG Br leur GN 438 710A 3 Burner LP Br leur PL 438 711A Glass Door Assembly Module de Porte en verre GLA ATSC 4 Log Grate Grille de B...

Страница 7: ...room in the U S A and Canada Homologation de l appareil Les mod les Heat N Glo dont il est question dans ce Guide d installation ont t test s conform ment aux normes d homologation et ont t approuv s...

Страница 8: ...he proper orifice for your location Approvals and Codes continued Installation haute altitude Les appareils gaz homologu s U L ont t test s et approuv s pour fonctionner entre 0 et 610 m tres d altitu...

Страница 9: ...r sentation des appareils gaz Heat N Glo Les appareils gaz vacuation directe Heat N Glo sont con us pour aspirer tout l air de combustion de l ext rieur de l difice et expulser tous les gaz de combust...

Страница 10: ...cassettes gaz Heat N Glo sont con ues pour tre encastr es dans des chemin es en mat riaux non com bustibles en ma onnerie ou pr fabriqu es combus tible solide qui ont t install es conform ment aux co...

Страница 11: ...mm to minimum fireplace height for bends in vent pipe DIMENSIONS MINIMUM DE L APPAREIL LARGEUR AVANT 835 mm LARGEUR ARRI RE 521 mm PROFONDEUR 345 mm HAUTEUR 508 mm REMARQUE Si le collet d vacuation de...

Страница 12: ...tion Pr cautions d installation du syst me d vacuation Avant de commencer installer les modules d vacuation l installateur doit lire ces instructions et celles des modules d vacuation afin d obtenir u...

Страница 13: ...nstallation de la cassette suite Un syst me d vacuation terminaison verticale install sur ce mod le doit inclure un 1 conduit flexible d air de combus tion de 76 mm de long un 1 raccord conduit capuch...

Страница 14: ...vertical vent systems installed on the outside of the building PENTE DU TOIT H MINI EN CM De plat 6 12 30 De 6 12 7 12 38 De 7 12 8 12 46 De 8 12 9 12 61 De 9 12 10 12 76 De 10 12 11 12 99 De 11 12 1...

Страница 15: ...3 This option shows both exhaust and inlet air vent pipes attached to the adaptor Figure 3 Cette option repr sente les conduits d vacuation et d admission d air attach s au raccord Installation de la...

Страница 16: ...T D ADMISSION D AIR EXHAUST STARTING COLLAR COLLET DE RACCORD DU CONDUIT D VACUATION INLET AIR STARTING COLLAR COLLET DE RACCORD DU CONDUIT D ADMISSION D AIR EXHAUST STARTING COLLAR COLLET DE RACCORD...

Страница 17: ...EUSE Figure 6 Gas Controls Systems Figure 6 Syst mes de commande de gaz tape 2 Emplacement nivellement et solidification de la cassette Installation de la cassette suite 1 Placez la cassette l emplace...

Страница 18: ...e tape 4 Conduit gaz REMARQUE Le conduit gaz doit tre install conform ment aux codes de construction locaux L installation doit tre effectu e par un technicien qualifi et ou muni d une licence de mani...

Страница 19: ...r less than one half 1 2 psig 3 5 kPa Installing the Insert continued Step 5 Gas Pressure Requirements Installation de la cassette suite tape 5 Sp cifications de la pression du gaz Pression Gaz nature...

Страница 20: ...VOUS ABSENTEZ POUR DES P RI ODES PROLONG ES DE CETTE FA ON LE FOYER NE POURRA PAS S ALLUMER ACCIDENTELLEMENT Filage de l allumage par veilleuse Sp cifications de l appareil Le fonctionnement de cet a...

Страница 21: ...UST BE REPLACED WITH TYPE 1050 C RATED WIRE REMARQUE S IL S AV RE N CESSAIRE DE REMPLACER LE FILAGE ORIGINAL TEL QUE FOURNIAVEC L APPAREIL UTILISEZ DU FILAGE DE TYPE 105 C Figure 9 Sch ma de filage du...

Страница 22: ...Logs and Ember Material Installation de la cassette suite tape 7 Installation des b ches et des braises Mise en place des b ches Si les b ches gaz ont t plac es en usine elles n ont pas besoin d tre r...

Страница 23: ...nt of the Ember Material 1 Soulevez la porte de garniture pour la retirer de l appareil 2 D verrouillez et retirez la porte en verre de l appareil Figure 10 Porte en verre Figure 11 Mise en place des...

Страница 24: ...urround it will be retained in the hole Figure 12 Figure 12 REMARQUE RETIREZ L ENSEMBLE DE LAPORTE DE GARNITURE AVANT ET LA PORTE EN VERRE DE LA CASSETTEAVANT D INSTALLER L ENTOURAGE 1 Rep rez les fil...

Страница 25: ...r other combustible projections above the gas fireplace Figure 13 La Figure 13 repr sente la dimension minimale verticale et la dimension maximale horizontale correspondante des habillages ou autres s...

Страница 26: ...ite tape 9 Avant d allumer l appareil Avant d allumer le foyer effectuez les op rations suivantes Revisez les consignes de s curit et les mises en garde Lisez la section Consignes de s curit et mises...

Страница 27: ...appareil Entretien de l appareil Bien que la fr quence de l entretien et des services d pende de l utilisation et du type d installation il est conseill de demander un technicien de service qualifi d...

Страница 28: ...at least annually thereafter more frequently if possible By Qualified service technician Home owner Task Inspect the external vent cap on a regular basis to ensure that no debris is interfering with...

Отзывы: