Revised 20-06-13
A
ss
e
mbly In
s
tru
c
tion
s
PL E ASE R E A D T H ESE INST RU C T I O NS C A R E F U L L Y
It i
s
s
trongly r
ec
omm
e
nd
e
d that thi
s
s
tov
e
i
s
fitt
e
d to your h
e
ating
s
y
s
t
e
m by a
knowl
e
dg
e
abl
e
,
e
xp
e
ri
e
n
ce
d and
s
uitably qualifi
e
d (H
e
ta
s
or
e
quival
e
nt) plumb
e
r
or H
e
ating Engin
ee
r with
e
xp
e
ri
e
n
ce
in fitting boil
e
r
s
tov
e
s
.
H
e
at D
e
s
ign
c
annot a
cce
pt r
e
s
pon
s
ibility for any fault ari
s
ing through in
c
orr
ec
t in
s
tallation
.
Fig 3
±
Packaging
Fig 4
±
Remove all packaging
Fig 5 Cau
s
e
way 16 boil
e
r Fig 6 Cau
s
e
way 25 boil
e
r
Fig 7 Cau
s
e
way 15i boil
e
r
s
tov
e
c
ompon
e
nt
s
s
tov
e
c
ompon
e
nt
s
s
tov
e
c
ompon
e
nt
s
Remove the packaging around the stove and, upon opening the door remove contents as shown
above
Carefully remove the straps and
box and carefully lift off pallet
Your Heat Design stove comes
packed in a cardboard box on a pallet
Содержание Causeway 15i
Страница 9: ...Revised 20 06 13 Boiler Connection ...
Страница 18: ...Revised 20 06 13 ...
Страница 19: ...Revised 20 06 13 ...
Страница 20: ...Revised 20 06 13 Heat Design 30 60 Hawthorn Road Western Industrial Estate Dublin 12 Ireland ...