Only use recommended fuels. The appliance can be damaged by burning petroleum coke, liquid
fuels or general rubbish and this will invalidate your warranty and risk your personal safety.
Th
e
applian
ce
mu
s
t not b
e
u
s
e
d a
s
a rubbi
s
h in
c
in
e
rator
.
M aint
e
nan
ce
Annual checking and servicing of the appliance and flue by a competent engineer
is recommended
Important Warning
This stove must
not
be installed into a chimney that serves any other heating appliance.
No purpose provided ventilation is normally required for stoves rated under 5KW. However for
newer build properties or properties that have been modified so that the design air permeability is
less than 5m
3
/h.m
2
a permanent ventilator will need to be fitted. Approved document J of the
building Regulations gives more detailed information. For each KW above 5KW, 550 sq mm of
fixed ventilation is required
±
i.e. a stove rated at 8KW would require 3 x 550 sq mm = 1650 sq
mm of fixed ventilation. If more than one appliance is installed in the same room, the ventilation
requirements for each appliance must be added together.
There must not be an extractor fan fitted in the same room as the stove as this can cause the stove
to emit fumes into the room.
In
s
tallation
Th
e
rmo
s
tat
A thermostat control is fitted to your boiler which is used to automatically regulate the water
output temperature and prevent water overheating in the boiler. It is recommended to initially set
the thermostat to half open and adjust as deemed necessary after the first few times of use to
achieve the desired output from the stove.
Chimn
e
y
The chimney height and the position of the chimney terminal should conform to Building
Regulations. Check that the chimney is in good condition, dry, free from cracks and obstructions.
The diameter of the flue should not be less than 150mm and not more than 200mm. If any of
these requirements are not met, the chimney should be lined by a suitable method. The chimney
must be swept before connection to the stove.
Where the chimney is believed to have previously served an open fire installation, it is possible
that the higher flue gas temperature from the stove may loosen deposits that were previously
firmly adhered, with the consequent risk of flue blockage. It is therefore recommended that the
chimney be swept a second time within a month of regular use after installation. If you have any
doubts about the suitability of your chimney, consult your local dealer/stockist.
If there is no existing chimney then either a prefabricated block chimney or a twin-walled
insulated stainless steel flue to BS 1856-1 can be used. These chimneys must be fitted in
DFFRUGDQFHZLWKWKHPDQXIDFWXUHU¶VLQVWUXFWLRQVDQGDOVRSOHDVHUHIHUWRWKHFXUUHQWLVVXHVRI
British Standards BS EN 15287-1:2007 for design, installation and commissioning of chimneys.
Содержание Causeway 15i
Страница 9: ...Revised 20 06 13 Boiler Connection ...
Страница 18: ...Revised 20 06 13 ...
Страница 19: ...Revised 20 06 13 ...
Страница 20: ...Revised 20 06 13 Heat Design 30 60 Hawthorn Road Western Industrial Estate Dublin 12 Ireland ...