![Heat & Glo SL-5 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/heat-and-glo/sl-5/sl-5_installation-manual_2115417022.webp)
Heat & Glo • SL-5, SL-7, SL-9 Installation Manual • 2392-980 Rev. L • 6/17
22
Two Elbows
Top Vent - Horizontal Termination - (continued)
Figure 4.11
Note
: Use SLP Series
components only.
Note
: There MUST be a 25%
reduction in total H when
using flex vent except when
using the simple up and out
installation. See Figure 4.8.
Fire Risk.
• When using SLP-HRC-SS termination cap
on top vented fireplaces, a one foot minimum
vertical vent section is required before installing
first elbow.
• When using DVP-TB1 termination cap on top vented
fireplaces, a three foot minimum vertical vent section is
required before installing first elbow.
INSTALLED
HORIZONTALLY
H
1
H
2
V
1
WARNING *
V Minimum
H
1
+ H
2
Maximum
SL-5
SL-7
SL-9
90 Elbow *
1/2 ft.
152 mm
1/2 ft.
152 mm
0 ft.
0 mm
1/2 ft.*
152 mm
1 ft.
305 mm
1 ft.
305 mm
1 ft.
305 mm
1-1/2 ft.*
457 mm
2 ft.
610 mm
2 ft.
610 mm
2 ft.
610 mm
2-1/2 ft.*
762 mm
4 ft.
1.2 m
4 ft.
1.2 m
4 ft.
1.2 m
3-1/2 ft.
1.1 m
6 ft.
1.8 m
6 ft.
1.8 m
6 ft.
1.8 m
4-1/2 ft.
1.4 m
14 ft.
4.3 m
14 ft.
4.3 m
14 ft.
4.3 m
H + H
1
MAX. =14 ft. (4.3 m)
V + H + H
1
MAX. = 40 ft. (12.2 m)
* See warning below