
H B X E C O - 0 5 5 0 G e o t h e r m a l C o n t r o l
V e r s i o n 2 . 0 0
© HBX Control Systems Inc. 2018
Page 7
GEOTHERMAL MODE PROGRAMMING GUIDE
1) HEAT PUMPS
SETUP MENU
2.00
1) HEAT PUMPS
2) TANKS
3) BACKUP
4) ENERGY CLOCK
5) PRIORITY
6) WIFI
COLD
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
SETUP MENU
2.00
1) HEAT PUMPS
2) TANKS
3) BACKUP
4) ENERGY CLOCK
5) PRIORITY
6) WIFI
COLD
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
1) HP STAGES
2) LAG TIME
3) ROTATE TIME
4) ROT CYCLES
5) OFF STAGING
6) °C OR °F
1
3
m
OFF
OFF
ON
°F
HEAT PUMP SETUP
Stages
This setting will allow you to select the number of heat pump stages that are
attached to the control.
If Backup is being used, you can only have a maximum of 2 stages.
(
1 to 3
) Default:
1
Lag Time
When the heat pump is set for more than 1 stage, this setting will be set for the
minimum lag time between heat pump stages. This is a time delay between stages.
Even if the differential has been exceeded this time must elapse before that stage
can come on.
(
1m to 240m
) Default:
3m
Rotate Time
The time of rotation between heat pumps. This setting is in hours of run time. This
means that the heat pumps are going to rotate when the first heat pump exceeds
the second by the rotate time.
(
OFF/1H to 99H
) Default:
OFF
Rotate Cycles
Set the number of cycles at which you would like to rotate the heat pumps. One
cycle is described as the heat pump going on and then off.
(
OFF/1 to 240
) Default:
OFF
Off Staging
This feature is used to set how you would like to stage the heat pumps off. If set to ON
the heatpumps will stage off normally, based off of tank temperature and differential
settings. If set to OFF the heat pumps will all stage off at the same time, based off of
tank temperature and differential settings.
(
OFF/ON
) Default:
ON
Heat Pump Setup
This setting is used to configure the heat pump staging component in your system.