
22
CPW 0604 BA CPW 0604 Issue 10.09.13 (From Software-Release 0.0.1.31)
3.4
Connecting the Welding Machine to the Primary Power Supply
Compare the primary voltage specified on the type plate with the voltage provided
by your primary power supply. The type plate is located on the backside of the
stud welding machine.
Never connect the welder to a power supply with a voltage
different from the voltage indicated on the type plate.
Check the current consumption specified on the type plate with the fuse rating of
your primary power supply.
Have an electrician check whether the outlet to which you want to connect the
stud welding machine is correctly grounded.
Switch off the stud welding machine.
Insert the primary plug (CEE plug) into the checked outlet.
Front view of the stud welding machine
3 Starting-up
3.4 Connecting the Welding Machine to the Primary Power Supply
Содержание CPW 0604
Страница 1: ...CPW 0604 CNC Production Welder Operating Manual 2013...
Страница 10: ...10 CPW 0604 BA CPW 0604 Issue 10 09 13 From Software Release 0 0 1 31 1 General...
Страница 17: ...CPW 0604 BA CPW 0604 Issue 10 09 13 From Software Release 0 0 1 31 17 Markings 1 General 1 7 Markings...
Страница 106: ...106 CPW 0604 BA CPW 0604 Issue 10 09 13 From Software Release 0 0 1 31 4 Function 4 10MenuPARAMETERCNC...
Страница 173: ...CPW 0604 BA CPW 0604 Issue 10 09 13 From Software Release 0 0 1 31 173 Service Support Service Support...
Страница 179: ......