
20
C 08 Order No. BA 92-20-256 Issue 01.03.08
Retighten the retaining nut.
Retighten regularly and carefully the chuck at the four
segments (see figure below, at the visible end of the chuck)
using pliers to ensure a proper current transition. This will
prevent early wear through spark erosion.
4.3
Installation of Chuck
Put the chuck with loose retaining nut up to the stop into the piston of the
welding gun.
Tighten the retaining nut with the socket wrench SW 17.
Содержание 92-20-256
Страница 1: ...C 08 Welding Gun 92 20 256 Operating Manual...
Страница 41: ...C 08 Order No BA 92 20 256 Issue 01 03 08 41 Welding gun type C 08 92 20 256...
Страница 57: ...C 08 Order No BA 92 20 256 Issue 01 03 08 57 Service Support...
Страница 61: ......