![HBK U9C Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/hbk/u9c/u9c_mounting-instructions_2111685017.webp)
15
U9C
MECHANICAL INSTALLATION
1. Installation and locking with initial stress (for dynamic loading):
-
Unscrew the locknut and screw on the threaded connector.
-
Pre-stress the transducer to 110% operating load in tensile direction. The trans
ducer itself can be used to measure this force
-
Hand-tighten the locknut.
-
Relieve the load on the transducer.
Notice
If the torque for locking is shunted through the transducer, ensure that the maximum
torque is not exceeded. See specifications.
2. Mounting with locking
Screw on the load application parts and lock with a torque according to the table below.
Notice
As the initial stress also depends on the friction between the locknut and thread, the initial
stress cannot be precisely set correctly with this method. When using the force transducer
under high alternating loads, we therefore recommend installation using method 1 (instal
lation and locking with initial stress).
Nominal (rated) force range
Torque
[Nm]
50 N - 1 kN
8
2 kN - 20 kN
40
50 kN
200
7.3.2
Mounting with knuckle eyes
Knuckle eyes prevent the application of torsional moments and, where two knuckle eyes
are used, bending moments, together with lateral and oblique loads. They are particularly
suitable for static and quasi-static measurements. We recommend tension/compression
bars that are pliable for dynamic alternating loads.
Mounting with knuckle eyes is implemented in the same manner for loads a mounting
with tension/compression bars. Knuckle eyes without locking can be used for static and
quasi-static applications.
Содержание U9C
Страница 3: ...U9C ENGLISH DEUTSCH FRAN AIS ITALIANO Mounting Instructions...
Страница 5: ...3 U9C TABLE OF CONTENTS 9 Dimensions 24 10 Specifications 29 10 1 Versions and ordering numbers 33...
Страница 37: ...U9C ENGLISH DEUTSCH FRAN AIS ITALIANO Montageanleitung...
Страница 69: ...U9C ENGLISH DEUTSCH FRAN AIS ITALIANO Notice de montage...
Страница 105: ...U9C ENGLISH DEUTSCH FRAN AIS ITALIANO Istruzioni per il montaggio...
Страница 107: ...3 U9C SOMMARIO 9 Dimensioni 28 10 Dati tecnici 33 10 1 Versioni e no ordine 37...
Страница 143: ...39 U9C DATI TECNICI...
Страница 144: ...HBK Hottinger Br el Kjaer www hbkworld com info hbkworld com A03815 03 YI0 02 7 0111 0012...