12x10 & 12x12 eCONO Apex Shelter
FITTING INSTRUCTIONS
KICK BOARD LINED- optional extra on 10ft deep shelters
Install the kick boarding sheets following the design below- the kickboards will have letters marked in pencil on them.
Start with the first board hard into the corner, fix using 40mm galvanised nails. Start with A- finish with G.
A
B
C
D
E
F
G
H