12x10 & 12x12 eCONO Apex Shelter

 

FITTING INSTRUCTIONS 

 

 
 

Fit the front height extension panel to the top of the front panel. The top height extension panel bottom shiplap board oversails the bottom 
timber and when in position the oversail shiplap needs to be nailed to the front panel top beam. 

Temporarily fix using 100mm screws, once you are happy with the position fix using 3 x M8x100mm coach screws and washers. Fix from 
underneath, also fix into the 2 sidewalls for additional support using 100mm screws. 

Using the 40mm nails provided fix the bottom shiplap board of the height extension panel to the top frame rail of the front panel. 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание eCONO Apex 12x10

Страница 1: ...g will be to install Fit left hand side panel to rear panel as below using 3 x M8x100mm Coach screws and washers Top middle bottom Ensure the panel is level upright You can temporarily fix using 100mm...

Страница 2: ...and washers Top middle bottom Ensure the panel is level upright You can temporarily fix using 100mm screws and install the coach screws and washers when all 4 walls are fitted together and squared up...

Страница 3: ...rily fix using 100mm screws and install the coach screws and washers when all 4 walls are fitted together and squared up Measure both internal diagonals to ensure they are both equal this will ensure...

Страница 4: ...screws once you are happy with the position fix using 3 x M8 x100mm coach screws and washers from the underside of the top rail of the sidewall up and into the uprights on the gable ends The gable end...

Страница 5: ...tion the oversail shiplap needs to be nailed to the front panel top beam Temporarily fix using 100mm screws once you are happy with the position fix using 3 x M8x100mm coach screws and washers Fix fro...

Страница 6: ...ce DO NOT USE A STANDARD DEPTH PURLIN IN THE HANGERS the correct purlin will sit flush with the top of the gable end top plate while a standard purlin will sit above the gable end top plate and is an...

Страница 7: ...roof nails per purlin per sheet Do not put a nail where the next sheet overlaps until the next sheet is fitted allow min one roll overlap Do not nail the top of the sheet at the first apex purlin as...

Страница 8: ...Fit the front and rear cover fillets screw in place using 2 x 70mm No 4 screws top middle bottom For eCONO Plus shelters fit the gallows brackets using 100mm No 5 screws one top bottom fit the front...

Страница 9: ...onal extra on 10ft deep shelters Install the kick boarding sheets following the design below the kickboards will have letters marked in pencil on them Start with the first board hard into the corner f...

Страница 10: ...LOWING OVER IN HIGH WINDS We suggest bolting down to a concrete slab or fence posts driven into the ground a minimum of 2ft on all corners and bolted to the shelter The more fence posts you drive in a...

Страница 11: ...side add on for purlins at ridgeline 2 x reduced depth roof purlins for first and last purlins in metal hangers shorter in depth than standard 1 x centre canopy support 21 x M8 x 100mm coach screws an...

Страница 12: ...t ridgeline 2 x reduced depth roof purlins for first and last purlins in metal hangers shorter in depth than standard 2 x gallows brackets 1 x front fascia board 18mm x 145 x approx 3 5m 1 x centre ca...

Страница 13: ...shelter yourself please be very careful during construction DO NOT INSTALL YOUR SHELTER DURING PERIODS OF HIGH WINDS MAKE SURE YOU WEAR YOUR PERSONAL PROTECTIVE EQUIPMENT not supplied PLEASE ENSURE TH...