12x10 & 12x12 eCONO Apex Shelter
FITTING INSTRUCTIONS
Fit front panel to both side panels as below using 3 x M8x100mm Coach screws and washers to each side. Top middle &
bottom. Ensure the panel is level & upright.
You can temporarily fix using 100mm screws and install the coach screws and
washers when all 4 walls are fitted together and squared up.
Measure both internal diagonals to ensure they are both
equal
–
this will ensure the building is square- DO NOT PROCEED UNTIL BUILDING IS SQUARE OR YOUR ROOF SHEETS WILL
NOT FIT.
MUST BE EQUAL
If your shelter has kick board
lining you can use the square
corner of a sheet to check the
building is square