MACH® Gas-Fired Boiler
59
8.4
M
ACH
®
B
OILER
A
LTITUDE
D
ERATE
S
CHEDULE
For installations over 2000 ft elevations, a derate schedule is applied. The boiler input rating must be
reduced by 4% per 1000 ft.
This is illustrated using the following graph.
4% Derate Schedule
0
5
10
15
20
25
30
35
40
45
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
Altitude (ft)
T
o
ta
l
D
e
ra
te
(
%
)
Derate procedure is as follows:
With the boiler at high fire, adjust the gas valves (as described in section 3.10.4) to get 5% O
2
in the flue
gas. If this cannot be achieved, perform the following steps:
If the O
2
% is too high, then the inlet gas pressure should be adjusted to the minimum pressure
allowed, typically 5” w.c. The gas valve should be adjusted to obtain approximately 5% O
2
. If the
O
2
% is still too high, the fan speed may be lowered. This procedure should only be performed by
factory trained personnel.
If the O
2
% is too low, then the gas valve settings should be reduced.
This procedure is also described in Bulletin 06-08.
Содержание MACH C1500GG
Страница 49: ...MACH Gas Fired Boiler Page 49 6 1 3 MACH Boiler C1500GG C2000GG Wiring Diagram ...
Страница 50: ...MACH Gas Fired Boiler Page 50 6 1 4 Dual Fuel Control Wiring MACH C1500GG C2000GG ...
Страница 58: ...MACH Gas Fired Boiler 58 8 3 MAINTENANCE LOG Date Hi Low Fire O2 CO CO2 Stack Temp pH Action By ...