background image

 

MACH

®

 Gas Fired Boiler 

 

19 

 

Cement and primer must conform to 
ASTM F493  

 

Three feet of venting closest to the boiler 
must not be enclosed  

 

The vent shall not be insulated  

Table of CPVC Support Spacing (Feet) 

Table of Stainless Steel Adapter for CPVC Part Numbers 

 

Vent Size 

Sch 40 

Sch 80 

4-1/2 

4-1/2 

5-1/2 

10 

5-1/2 

12 

6-1/2 

A customer supplied adapter is required to be installed between the boiler and the CPVC venting. Below is a table 
containing the available adapter for each size MACH

®

 boiler.  Installer should use Adapters listed below or equivalent. 

 

3.5.3.5 

Required Clearances 

Provide clearances between combustion air intake, exhaust vent, roof and wall surfaces, doors and window, and 
snow line.   Refer to Figure below: Termination Clearances – Forced Draft and Direct Vent Installations. 

  

Reference: NFPA 54/ANSI Z223.1 National Fuel Gas Code 
 

 

 

Boiler Size 

Nominal 

Stack Size 

Stainless Adapter for CPVC                

Part Number 

C750 

6" 

2620000237 

C900 

8" 

2620000238 

C1050 

8" 

2620000238 

  Do not locate intake or exhaust terminations directly above a walkway; 

dripping of condensation can cause icing of the walking surface.  Maintain a minimum clearance of 4 ft 
(1.22 m) horizontally from any electric or gas meter, regulator or relief equipment.

 

 

Содержание C750

Страница 1: ...et East Stroudsburg PA 18301 Telephone 570 476 7261 Facsimile 570 476 7247 www harscopk com MACH C750 C900 C1050 Rev 1 05 07 01 2013 C S A Design Certified Complies with ANSI Z21 13 CSA 4 9 Gas Fired...

Страница 2: ...ty Checks 30 3 10 Initial Adjustments 31 3 11 Burner Adjustment 34 4 OPERATION 36 4 1 General 36 4 2 Normal Lighting and Shut Down Procedures 36 4 3 Typical Boiler Utility Requirements 37 5 MAINTENANC...

Страница 3: ...plier It is essential to read understand and follow the recommendations of this manual before installing operating or servicing this equipment Installation and service must be performed by a qualified...

Страница 4: ...ture sensors pumps flow switches balancing valves and check valves will be required for satisfactory operation of any system Harsco Industrial Patterson Kelley cannot be responsible for the design or...

Страница 5: ...e are affixed to your boiler Although the labels are of high quality they may become dislodged or unreadable over time Contact Harsco Industrial Patterson Kelley toll free at 877 728 5351 for replacem...

Страница 6: ...omponents could be hot Do not touch piping or stack surfaces during operation or immediately after shutdown of the boiler Burn hazard Hot fluids Use caution when servicing or draining the boiler Fire...

Страница 7: ...utralization kit is available Please contact your local Harsco Industrial Patterson Kelley representative 2 5 5 Pressure Hazards Pressure hazard Hot fluids Install isolation valves on boiler water inl...

Страница 8: ...diction or in the absence of such requirements to the National Fuel Gas Code ANSI Z223 1 NFPA 54 latest edition in the U S In Canada the equipment shall be installed in accordance with the current Ins...

Страница 9: ...described in the National Fuel Gas Code NFPA 54 ANSI Z223 1 Latest Edition Clearances from Adjacent Walls Ceiling and Obstructions Side Clearances for a Row of Boilers Type of Surface Dimensions inche...

Страница 10: ...erminal Block The boiler power circuit requires 120 VAC 60 hertz with a dedicated neutral and ground as labeled Electrical service must be rated for 8 amps minimum Before starting the boiler check to...

Страница 11: ...to the outdoor temperature sensor The temperature control must be programmed to run an outdoor air schedule The outdoor air sensor and programming help are available from the local Harsco Industrial...

Страница 12: ...or death due to fire or asphyxiation Before connecting a boiler to a venting system it must be determined whether the boiler is to be installed in a conventional or Direct Vent configuration In the US...

Страница 13: ...es Maintain clearances to combustibles as listed in the vent manufacturer s installation instructions or as set forth in the codes and standards listed in this section Do not use these vent pipes for...

Страница 14: ...e considered part of the required volume The minimum volume is 50 ft 3 per 1000 Btu hr 4 8 m 3 kW of installed appliance input capacity Openings used to connect indoor spaces to obtain the required mi...

Страница 15: ...tilation opening must be either 10 of the net free area required for combustion air or 10 sq in 6500 mm 2 whichever is greater B Use the following opening calculation for MACH or MODU FIRE FD boilers...

Страница 16: ...ombustion Air Opening Ventilation Air Opening Model Input Btu Hr in 2 mm 2 in 2 mm 2 C750 750 000 25 16 129 10 6 452 C900 900 000 30 19 355 10 6 452 C1050 1 050 000 35 22 581 10 6 452 3 5 3 Flue Venti...

Страница 17: ...ondensate drains in the exhaust vent Table of Required Stainless Steel Vent Adapters and Category II Motorized Dampers The normally closed motorized damper operates on 120 VAC and features an end limi...

Страница 18: ...and the SMACNA Thermoplastic Duct Construction Manual Install manufactured vent systems in accordance with the manufacturer s listing and instructions When venting this boiler using CPVC vent material...

Страница 19: ...er should use Adapters listed below or equivalent 3 5 3 5 Required Clearances Provide clearances between combustion air intake exhaust vent roof and wall surfaces doors and window and snow line Refer...

Страница 20: ...operation of regulators relief valves or other equipment Interior Component Clearances All vent system components shall be installed so as to maintain the following required minimum clearances Combus...

Страница 21: ...drain section not provided NOTICE The condensate formed from natural gas flue gases is acidic The condensate shall be drained in accordance with local code requirements A condensate neutralizer may be...

Страница 22: ...rized venting system Such a system employs a sealed combustion air intake duct leading from outdoors and a sealed exhaust vent terminating outdoors Air flow through the system is maintained by the com...

Страница 23: ...for all terminations NOTICE Drains have been omitted for clarity Sidewall Vent Sidewall Air Inlet above Vertical Vent Room Air Inlet above Vertical Vent Sidewall Air Inlet above Vertical Vent Vertical...

Страница 24: ...cigarette cigar or pipe 6 After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above return doors windows exhaust fa...

Страница 25: ...feet 90 Ell Feet Tee Feet 20 40 60 80 100 150 200 1 2 0 622 1 55 3 1 120 82 66 57 50 40 35 3 4 0 824 2 06 4 12 250 170 138 118 103 84 72 1 1 049 2 62 5 24 465 320 260 220 195 160 135 1 1 4 1 380 3 45...

Страница 26: ...ered by warranty Proper flow rates may be achieved through a combination of primary and secondary flow loops Multiple zones and pumps may result in different flow rates at different times Consideratio...

Страница 27: ...t Connections All water connections should be in compliance with national state and local code requirements Adapters from Victaulic to NPT are available from Harsco Industrial Patterson Kelley The bot...

Страница 28: ...l in the boiler is insufficient It does not detect low water conditions in other parts of the system Installation of high point vents or additional low water safety devices to protect the system shoul...

Страница 29: ...quate capacity refer to Section 3 5 7 The boiler is placed the proper distance from any combustible walls in accordance with Section 3 3 3 8 Relief valves have been piped to an acceptable drain refer...

Страница 30: ...on 3 9 2 Test of Low Water Cut off The boiler is furnished with a probe type low water cut off in the outlet nozzle Test as follows Push and hold the red Push to test button for at least 5 seconds A...

Страница 31: ...e stamped providing built in history of boiler status and performance This control constantly tracks the load by recording burner high low and mid run hours One control to do it all temperature contro...

Страница 32: ...e 0 CH settings Setpoint 180 F BLR OP 1 CH mode 0 CH settings Setpoint 180 F BLR OP 1 CH mode 0 For example selecting the Setpoint parameter opens up a screen that allows the setpoint to be changed CH...

Страница 33: ...ERS menu allows the user to set up selected boiler functions and operating modes The CONFIGURATION menu covers basic display information such as language units date time etc The CASCADE menu is used t...

Страница 34: ...port This port is located on the upstream side of the valve body for measuring supply pressure Seefigure right The air flow is pre set at the factory prior to shipment Gas flow is dependent primarily...

Страница 35: ...astic cap from the gas valve Using a 3mm 7 64 hex wrench adjust the high fire screw see the figure below on each of the gas control valves by turning clockwise or counterclockwise to achieve the desir...

Страница 36: ...back of the boiler 4 2 NORMAL LIGHTING AND SHUT DOWN PROCEDURES Do not use this boiler if any part has been under water Immediately call a qualified service technician to inspect the boiler and to rep...

Страница 37: ...tion Use care when reassembling main gas line to assure all connections are tight Use care when servicing boiler in order to prevent the accumulation of gas in or around the combustion chamber Determi...

Страница 38: ...ion 3 9 3 Test operating temperature controls by reducing or increasing temperature setting as necessary to check burner operation 4 Test the low water cut off Refer to Section 3 9 5 Test low gas pres...

Страница 39: ...for requirements in addition to those listed below a Check all joints and pipe connections for tightness b Check pipe for corrosion or deterioration If any piping needs replacing do so immediately c...

Страница 40: ...below 7 After ignition the fan may be driven to low fire before the boiler is released to modulation 8 The control modulates the firing rate between low and high fire to maintain the desired outlet w...

Страница 41: ...reset button and the sequence of operation will resume at Step 4 5 5 3 Low Gas Pressure The low gas pressure switch opens when there is insufficient gas pressure available for proper operation of the...

Страница 42: ...trial for ignition Check that the spark electrode ignition wire and gas valve are functioning properly When FLAME FAILURE is shown on the display the boiler lost the flame during run Check that the co...

Страница 43: ...TOO LATE ERROR 20 Flame still present 10 sec after closing the gas valve A20 FLAME ERROR I 21 Flame detected just before gas valve opened A30 HIGH GAS PRESSURE ERROR 32 Gas pressure is to high A31 LOW...

Страница 44: ...A16 20 MS XLR ERROR 22 Internal software error A18 STACK ERROR 19 Internal software error A19 FLAME OUT TOO LATE ERROR 20 Flame still present 10 sec after closing the gas valve A20 FLAME ERROR I 21 Fl...

Страница 45: ...mmended for this equipment All control components are engineered for safety and are designed to work in unison with each of the other components Use of non factory authorized replacement parts jeopard...

Страница 46: ...ith TB2 14 Damper Output 8 GROUND Boiler Supply Ground 0 VAC 9 GROUND Boiler Supply Ground 0 VAC 10 120VAC SW OUTPUT 120VAC output when boiler is switched on pilot duty only 11 120VAC 3 WAY VALVE 120V...

Страница 47: ...TAT OR SENSOR Domestic Hot Water sensor or thermostat 8 DHW STAT OR SENSOR 9 HEADER TEMP SENSOR Header temperature sensor 10 HEADER TEMP SENSOR 11 DHW FLOW SWITCH Domestic Hot Water flow switch output...

Страница 48: ...MACH Gas Fired Boiler 48 5 6 3 Wiring MACH Boilers C750 900 1050...

Страница 49: ...MACH Gas Fired Boiler 49 5 7 BOILER PARTS LIST 5 7 1 MACH Boiler 750 900 1050 Main Assembly Mark Description 1 Heat Engine 2 Boiler Gas Train 3 Cabinet 4 Control Panel...

Страница 50: ...Display Cover 4 ENVI Control Display Module 5 Circuit Breaker 6 On Off Switch 7 ENVI Control Interface Board 8 Low Water Cut off 9 ENVI Control Board 10 TB1 Low Voltage right rear of boiler 11 TB2 Hi...

Страница 51: ...lower to Burner Hood 2 Burner Hood 3 Burner Hood Gasket 4 Burner 5 View Glass Assembly 6 Heat Exchanger Sectional Castings 7 Exhaust Gasket 8 Condensate Collector 9 Inspection Cover w gasket 10 Water...

Страница 52: ...Train Mark Description 1 Main Gas Shut off Valve 2 Low Gas Pressure Switch 3 High Gas Pressure Switch 4 Dual Main Gas Valve Regulator 5 Gas Manifold Shut off Valve 6 Flex Hose with Gas Valve Adaptor...

Страница 53: ...F Any failure resulting from misuse modification not authorized by Seller in writing improper installation or lack of or improper maintenance G Equipment furnished by the owner either mounted or unmou...

Страница 54: ...ency Comb Air Pres intake w c w c F Water Outlet temperature F 3 Flow through boiler GPM 4 Operating Temperature Setpoint F from internal OR external control 5 Stack Pressure measured where stack exit...

Страница 55: ...MACH Gas Fired Boiler 55 APPENDIX 1 MAINTENANCE LOG Date Hi Low Fire O2 CO CO2 Stack Temp Adjustments By...

Страница 56: ...e is as follows With the boiler at high fire adjust the gas valves as described in section 3 10 4 to get 5 O2 in the flue gas If this cannot be achieved perform the following steps If the O2 is too hi...

Страница 57: ...MACH Gas Fired Boiler 57...

Страница 58: ...MACH Gas Fired Boiler 58...

Отзывы: