SHE-010/015/020/025/030/035/076
Premier Curved Team Shelter
Code:
Product:
Assembly Instructions
IMPORTANT
All bolts should be hand tightened only, until the shelter
has been fully assembled.
Page 3
25
5
3
1
.)Attach the backbar (5) by sliding in-between the brackets on the
sideframes and line up the holes. You will need 3 people for this as the
sideframes need to be held with the uprights face down on the floor,
as shown in Figure 2. When the backbar is in position, use 2 x BOL472
(22) to attach to the sideframes (Figure 1). Fix with a plastic washer
both sides (20) and a nylock nut (18). When doing so, make sure the
backbar is orientated so that the foot plate in the middle is pointing up
towards the sky as figure 2.
Figure 1.
Figure 2.
2
.) Attach the bent supports (3) to
the backbar by using BOL771 (25).
Locate the holes in the underside
of the backbar and line up the
screw port within the extrusion of
the supports. With 1-2 people
holding the bent supports in
position the other can screw the
self tapping bolt in place. This will
require a 10mm extension tool or
the T-Handle nut driver (30)
supplied with the shelter. Make
sure when doing so that the bolt is
straight as the thread is being cut
at the same time. This is made
easier by ensuring the bent support
is square with the backbar (See
Figure 3).
Figure 3.
Screw port
22
5
18
20
20