background image

Product:

Code:

SHE-010/015/020/025/030/035/076

Premier Curved Team Shelter

Page 5

7.) Once all the plastic is in place the
crossbar (6) needs to be fixed into
position. Attach the crossbar using the self
tapping screws (25) by locating the holes
in the crossbar and lining those holes up
with the screw port in the extrusion in the
bent supports. It is best to screw in the end
screws first so that the crossbar is
supported at both ends. You then need to
tighten up the middle 3 screws gradually
as the crossbar pulls onto the face of the
bent supports.

. When

doing so make sure the PET sheets are
lined up to fit into the recess of the
crossbar. This is important as this will
hinder the screws from pulling into the
supports.

You will need a 10mm deep

drive socket/FAS005 (30) for this

Figure 10

26

25

27

6

Figure 12

28

6

.) At this point the back sheets (9) need to be slid

into place. Again this is a 3 person task, one person
will need to hold and support the weight of the sheet
and the other 2 to guide and push the sheet into the
recess into position. The sheets need to slide into the
recess of the extrusion of the bent supports, where
the rubber is located (shown more clearly in figure
11).

.

The sheet must slide in square, otherwise it will grip
on the rubber and wont slide in. As the plastic sheet
nears the bottom, make sure you line it up with the
back support slot so when it reaches the bottom it will
locate in position.

Note: It is recommended to use some kind of

silicone lubricant to aid the plastic sheets to slide in

Note: There will be an overhang of approx 13mm at the
top of the support.

9

Figure 11

9

3

When the crossbar is fitted tightly you can finish it off by inserting
the round caps (26) into the front of the crossbar and the end
caps (27) in either end of the crossbar by using the 10g self
tapping screws (

) (Figure 12).

29

Содержание SHE-010

Страница 1: ...M 1 x CROSSBAR BACKBAR 6M 1 x Backbar 1 x Crossbar 2 x Retaining bar RETAINING TUBES Retaining Tube PEQ078 FEP042 1 1 x L H SIDE FRAME FEP043 2 1x R H SIDE FRAME FEP049 FEP045 046 FEP044 FEP041 1 x CR...

Страница 2: ...E 010 015 020 025 030 035 076 14 CAP951 15 CAP096 16 CAP097 17 BOL400 18 BOL402 19 BOL715 20 BOL722 21 BOL546 22 BOL472 23 BOL520 24 BOL450 25 BOL771 26 CAP095 27 PEP050 28 BOL782 Page 2 29 FAS005 Par...

Страница 3: ...a nylock nut 18 When doing so make sure the backbar is orientated so that the foot plate in the middle is pointing up towards the sky as figure 2 Figure 1 Figure 2 2 Attach the bent supports 3 to the...

Страница 4: ...This is done by placing a skiffy washer 20 on first and then fixing with BOL400 17 Hand tighten this at first as you will need to allow movement between the sections when fitting the plastic later No...

Страница 5: ...At this point the back sheets 9 need to be slid into place Again this is a 3 person task one person will need to hold and support the weight of the sheet and the other 2 to guide and push the sheet in...

Страница 6: ...eat support frames 10 You will notice that the seat support will be a snug fit within the shelter Insert BOL450 24 through the hole in CAP097 16 and then insert through the hole and attach BOL715 19 a...

Страница 7: ...h holes in the fixing plates Foundation Installation Foundation Installation 165mm 1 Dig a hole to the dimensions shown 2 Fill the hole with concrete and level Wait until the concrete is fully cured b...

Отзывы: