To ensure accurate positioning of anchor points, the
best method of marking out is to build the shelter and
mark through holes in the fixing plates.
Foundation Installation
Foundation Installation
165mm
1.) Dig a hole to the dimensions shown.
2.) Fill the hole with concrete and level.
Wait until the concrete is fully cured
before fixing down the shelter.
Anchor Point Dimensions
Anchor Point Dimensions
SHE-020/025 - 5m Shelter = 5111mm Anchor Centres
SHE-030/035 - 6m Shelter = 6111mm Anchor Centres
Plan view of 4m Shelter
Anchoring options:
ANC-010: Expanding Anchor Bolt Set Per 7
ANC-025: Chemi - Bolt Set Per 7