background image

Product:

Code:

SHE-010/015/020/025/030/035/076

Premier Curved Team Shelter

22

18

12

3

Page 4

3

.) Attach the back supports (12) between

the bent supports (3) by attaching with 2 x
BOL472 (22)

. Fix with a skiffy

washer on both sides and a nylock nut on
the one side. Make sure that the bolts are
only finger tight so that there is still some
movement on the bracket. Attach the back
supports to the sideframe using a skiffy
washer (20) and BOL546 (21) as shown in
figure 6.

(Figure 4)

Figure 5.

Figure 4.

4

.) Attach the retaining bars (7) from one end by

sliding through the holes located in the
sideframe and the bent supports (3). This will
require 2 people as one will need to push the
bars through while the other will need to slide the
bars through the retaining tubes (8) to space the
sections at the correct length (Figure 7). Once
the retaining bar is all the way through there
should be approx 15mm protruding either side.
This allows the bar to be fixed and tightened at
each end. This is done by placing a skiffy
washer (20) on first and then fixing with BOL400
(17). Hand tighten this at first as you will need to
allow movement between the sections when
fitting the plastic later.

Note: CAP951 (14) needs to be fitted once the
retaining bars have been tightened and the shelter is
complete (Figure 7).

14

17

20

7

8

Figure 7.

5.)

Now the

main structure is assembled the seat support frames (10) need to
be fixed to the bent supports (3). This is done by

2 x

M8*40mm bolts (23) into the bolt track of the bent supports (Figure
8) and fixing the frames to the supports. Line up the bolts with the
holes in the support frame then fit BOL715 (19) and BOL402 (18)
(Figure 9). Put these on finger tight at first until the seats are
positioned correctly as this will allow some
movement needed to fix the seats.

Note: When you come to tighten up
the nuts, make sure the bottom of
the seat frame is sitting flush on
the floor.

The shelter now needs to be tilted into the upright position

(Figure 8). The safest way to do this is to have one person support
each sideframe whilst another supports the bent supports.

sliding

18 19

23

10

12

20

21

Figure 6.

Figure 9.

23

Figure 8.

20

20

Содержание SHE-010

Страница 1: ...M 1 x CROSSBAR BACKBAR 6M 1 x Backbar 1 x Crossbar 2 x Retaining bar RETAINING TUBES Retaining Tube PEQ078 FEP042 1 1 x L H SIDE FRAME FEP043 2 1x R H SIDE FRAME FEP049 FEP045 046 FEP044 FEP041 1 x CR...

Страница 2: ...E 010 015 020 025 030 035 076 14 CAP951 15 CAP096 16 CAP097 17 BOL400 18 BOL402 19 BOL715 20 BOL722 21 BOL546 22 BOL472 23 BOL520 24 BOL450 25 BOL771 26 CAP095 27 PEP050 28 BOL782 Page 2 29 FAS005 Par...

Страница 3: ...a nylock nut 18 When doing so make sure the backbar is orientated so that the foot plate in the middle is pointing up towards the sky as figure 2 Figure 1 Figure 2 2 Attach the bent supports 3 to the...

Страница 4: ...This is done by placing a skiffy washer 20 on first and then fixing with BOL400 17 Hand tighten this at first as you will need to allow movement between the sections when fitting the plastic later No...

Страница 5: ...At this point the back sheets 9 need to be slid into place Again this is a 3 person task one person will need to hold and support the weight of the sheet and the other 2 to guide and push the sheet in...

Страница 6: ...eat support frames 10 You will notice that the seat support will be a snug fit within the shelter Insert BOL450 24 through the hole in CAP097 16 and then insert through the hole and attach BOL715 19 a...

Страница 7: ...h holes in the fixing plates Foundation Installation Foundation Installation 165mm 1 Dig a hole to the dimensions shown 2 Fill the hole with concrete and level Wait until the concrete is fully cured b...

Отзывы: