background image

PAGE 6

DOMED FRUIT CAGE ASSEMBLY INSTRUCTIONS

26: To fix the 2m wide side
netting, start by cutting to
allow the net to wrap around
the door support upright. This
will allow the top edge of the
net to run along the top edge
of the horizontal support bars.

27: Wrap the cut section of the side
net around the door support upright
as described in step 24. Tie in place
using net ties ( ref :26) at the top and
the bottom of the upright and a couple
equally spaced in between. Secure
the top of the net along the horizontal
bars using net ties (approx four for
every 2.5m length).

28: Continue to unroll the side
netting all the way round the
perimeter of your cage, keeping it
as taught as possible, securing as
step 25. When corners are
encountered snip the bottom few
cms flush with the ground to allow
the net to neatly fold.

29: To finish the side net and to cover the
door, unroll about 30cm past the door and
cut vertically.

30: Fold the side net around
the catch side of the door and
hold securely with several
equally spaced net clips
(ref:25). A small cut can be
made in the net to allow the
catch to protrude cleanly.

22: Slide the fitted roof net down over
the finial and align the seams with the
curved bars. Using net ties (ref :26)
secure the net around the base of the
finial and also around the curved bars.
Trim off the ends of the ties and also
any untidy stray netting.

With the aid of at least three people lift
the unit(s) into place .

23: Bolt (ref 21,22) the curved roof
supports (ref 24) onto the connector
plate (ref:18,19,20). Tighten the bolts
using a 17mm spanner (fig 10).

fig 12

fig 12

24. Place the assembled door frame in position and secure in by
joining the hinge blocks (Ref.8) as shown (fig 13) and tightening the
bolts with the 3mm allen key supplied and an 8mm spanner. Note as
the hinge blocks must spin on each other do not over tightening the
long bolt/nut through the bosses.

fig 13

fig 13

25. Secure the latch in place by sliding it over
the latch block and inserting the latch inserts
as shown (fig 14). Tighten the bolts with the
3mm allen key supplied to hold in place. Note
the latch should not be over-tightened as it
must slide freely. Note the latch has one
longer side and this must be positioned on the
side you wish to open the door.

fig 14

fig 14

Содержание GFC-130

Страница 1: ...TIVE DOMED FRUIT CAGE ASSEMBLY AND INSTALLATION INSTRUCTIONS PRODUCT CODE GFC 130 132 Revision 8 INS811 If you wish to concrete your cage in place please see page 8 For more information on our cages p...

Страница 2: ...PART IDENTIFICATION PAGE 1 11 10 9 22 21 24 25 1 23 3 2 4 13 12 18 4 22 21 21 26 27 23 A 8 7 13 6 22 14 5 17 4 3 16 15 14 5 12 7 8 27 20 18 19 9 11 10 2 1 E D F 17 A B C B E...

Страница 3: ...2 x 0 7m Horizontal Support PGG117 2 1 x Diagonal Support PGG007 3 2 x 1 9m Vertical Supports PGG006 4 1 x 2 3m Door Support Upright PGG112 DOMED FRUIT CAGE PARTS IDENTIFICATION GFC 130 GFC132 REF No...

Страница 4: ...her to form a framework of bars which represents the roof of your cage in plan form on the ground The soft mallet may be needed to help slide the bars together 4 Check that you are happy with the posi...

Страница 5: ...levelled 11 Place the uprights ref 4 into the holes and at the same time slide on the foot plates ref 12 as shown in fig 2 The uprights should be pushed into the ground approximately 30cm at this poi...

Страница 6: ...tion node finial ref 17 or 27 depending on choice and insert the curved roof bar with the hole 3 5cm from the end and bolt together using an M10 bolt and Washer ref 21 22 in place with the aid of a 17...

Страница 7: ...ref 25 A small cut can be made in the net to allow the catch to protrude cleanly 22 Slide the fitted roof net down over the finial and align the seams with the curved bars Using net ties ref 26 secure...

Страница 8: ...g where necessary Tie in the sides of the roof net s to the horizontal bars and side net by using the twine and whipping needle again trimming where necessary Net clips ref 25 can be used to aid in th...

Страница 9: ...over the set concrete Set the uprights level in the dry mix post crete by bracing with 45 degree wooden stakes G clamps can be used to secure the braces to the uprights When satisfied that the upright...

Отзывы: