| www.harmar.com | 800-833-0478
© 2016 Harmar All Rights Reserved
18
INSTALLER
4. Double-check hole positions for pilot holes.
Mark the three hole locations. Use the base as
a template, then remove base. Drill pilot holes
down through truck bed in the marked locations.
[Figure 18-1]
5. Climb under truck and inspect location of
pilot holes.
Again, be sure that the larger hole
will avoid the vehicle’s gas tank, spare tire,
suspension components, etc.
Finish drilling
by making 3/8” holes through the
truck bed and when possible, through the frame
of the truck in the locations shown by the arrows.
[Figure 18-2]
Wherever possible, incorporate the frame rails
of the truck. This is a requirement when lifting
heavier chairs and scooters.
[Figure 18-2]
6. Drill two more 3/8” holes
for the base leg
anchors through the truck bed; if the frame is
not captured, if bed material is too thin, and/or
application is very heavy.
[Figure 18-1 and 18-3]
T
OLI
P
Figure 18-1
CAUTION!
Avoid Gas Tank Fuel /
Brake / Electrical Lines
CAUTION!
If incorporating the frame is
impossible, large plates (not
supplied) may need to be used to
spread the force and keep the
truck bed from distorting. Call the
technical servce department for
further explanation.
Figure 18-2
INSTALLATION
Figure 18-3
Frame
Frame
Содержание AL215 Axis I
Страница 2: ...www harmar com 800 833 0478 2016 Harmar All Rights Reserved...
Страница 32: ...www harmar com 800 833 0478 2016 Harmar All Rights Reserved 30 INSTALLER AL425 EXPLODED VIEWS...
Страница 34: ...www harmar com 800 833 0478 2016 Harmar All Rights Reserved 32 INSTALLER AL435 T EXPLODED VIEWS...
Страница 40: ...www harmar com 800 833 0478 2016 Harmar All Rights Reserved 38 INSTALLER ELECTRICAL...
Страница 41: ...Inside Lifts Installation Owner s Manual TEC0091 2016JUN30 P N 630 00076 Rev A 39 INSTALLER ELECTRICAL...
Страница 42: ...www harmar com 800 833 0478 2016 Harmar All Rights Reserved 40 INSTALLER NOTES...