5 - Operation
42
Manoeuvring of the boom - Z-versions
The switches on the hydraulic control box controls the following
functions:
1.
Power ON/OFF
2.
Boom tilt left
3.
Boom lift raise/lower
4.
Boom tilt right
5.
Boom folding (both sides)
6.
Optional function
7.
Optional function
For unfolding of the boom then do the following:
1.
Push switch (3) upwards to lift the boom clear of the transport brackets.
2.
Push switch (5) to the left to unfold the boom.
3.
Push switches (2) and (4) downwards to lower individual tilt rams.
4.
Push switch (3) downwards to lower the boom to correct height above crop or ground level.
The folding procedure is the reverse of unfolding.
Содержание RANGER EAGLE
Страница 8: ...1 EC Declaration 8 ...
Страница 12: ...2 Safety notes 12 ...
Страница 26: ...3 Description 26 ...
Страница 40: ...4 Sprayer setup 40 ...
Страница 60: ...5 Operation 60 ...
Страница 62: ...6 Maintenance 62 Trailer lubrication oiling plan P T O lubrication oiling plan Serie 100 type P T O shaft C 50 ...
Страница 84: ...6 Maintenance 84 ...
Страница 95: ...8 Technical specifications 95 Charts Boom hydraulic Z Boom hydraulic Y ...
Страница 96: ...8 Technical specifications 96 ...
Страница 100: ...HARDI INTERNATIONAL A S Helgeshøj Allé 38 DK 2630 Taastrup DENMARK ...