5 - Operation
122
Quick Reference - Cleaning
μ
ATTENTION! Pump speed 250-280 rpm.
A.
Turn On.
B.
Turn Off.
C.
Minimum 45 seconds with nozzles Off.
D.
Spray until air comes out of nozzles.
When the pressure drops, close the regulation valve by pressing the
button on the SetBox, until
yellow LED lights on the valve (this can take up to 10 seconds).
Without DF4 system: When the boom is completely empty, press the
button for a few seconds
to avoid a pressure spike.
With DF4 system: Press “auto” to have the system remove pressure spikes automatically before next
start-up.
5 x 1/6
5 x 1/6
1/6
1/6
A
B
C
C
D
D
Содержание NAVIGATOR VPZ
Страница 4: ...1 EU Declaration 4...
Страница 72: ...3 Description 72...
Страница 135: ...6 Maintenance 135 Lubrication Plan Boom Wings 10...
Страница 174: ...6 Maintenance 174...
Страница 182: ...7 Fault Finding 182...
Страница 195: ...8 Technical Specifications 195 Hydraulic Diagrams Hydraulics for Boom of 21 24 Meters...
Страница 196: ...8 Technical Specifications 196 Hydraulics for Boom of 27 28 Meters...
Страница 198: ...8 Technical Specifications 198...
Страница 204: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...