5 - Operation
70
Quick Reference - Cleaning
÷
NOTE! Pump speed 250-280 rpm.
A.
Turn On.
B.
Turn Off.
C.
Minimum 45 seconds with nozzle Off.
D.
Spray until air comes out of nozzles. When pressure drops, close regulation valve by pressing the
button, until
yellow LED lights on the valve. When the boom is completely empty, press the
button for a few seconds to avoid
pressure spike.
Standard Cleaning
μ
ATTENTION! For cleaning between spray jobs where crops are not very sensitive towards chemicals just sprayed.
1.
Engage pump with tractor in idle, so that pump speed is as low as possible (250/550 rpm, depending on pump type).
2.
Turn suction valve towards
and the pressure SmartValve towards
while sucking approximately 1/6 of the
rinse tank content into the main tank. It is important to have full agitation for approximately 20 seconds, and then close
agitation valve completely.
3.
Turn suction valve towards
and the pressure SmartValve towards
with all sections off for approximately 45
seconds.
4.
Turn all sections on. Spray until air comes out of nozzles. When pressure drops, close regulation valve by pressing the
button, until yellow LED lights on the valve. When the boom is completely empty, press the
button for a few
seconds to avoid pressure spike.
Repeat the following 3 steps 5 times:
1.
Turn suction valve towards
and the pressure SmartValve towards
while sucking approximately 1/6 of the
rinse tank content into the Main tank.
2.
Turn suction valve towards
and the pressure SmartValve towards
with all sections off for approximately 45
seconds.
3.
Turn all sections on. Spray until air comes out of nozzles. When pressure drops, close regulation valve by pressing the
button, until yellow LED lights on the valve. When the boom is completely empty, press the
button for a few
seconds to avoid pressure spike.
5 x 1/6
5 x 1/6
1/6
1/6
A
B
C
C
D
D
Содержание NAVIGATOR FORCE
Страница 4: ...1 EU Declaration 4 ...
Страница 12: ...2 Safety Notes 12 ...
Страница 54: ...4 Sprayer setup 54 ...
Страница 76: ...6 Maintenance 76 Boom lubrication oiling plan ...
Страница 112: ...8 Technical specifications 112 ...
Страница 116: ...Index 116 ...
Страница 118: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...