6 - Maintenance
132
Occasional Maintenance
General Info
The maintenance and service intervals for the following components will depend very much on the conditions under which
the sprayer is operated, and therefore it is almost impossible to specify the intervals beforehand.
The operator must select appropriate intervals for the occasional maintenance.
If in doubt, contact your local HARDI dealer.
Lifting and Removing the Pump
When lifting and removing the pump, use a shackle fitted to the built-in
lifting eye located between the heads (A).
±
WARNING! To prevent damages in case of a free-falling pump, use
lifting gear and a steel shackle with at least 3.5 tonnes max. tensile
strength.
÷
NOTE! Pump weight is approximately 75 kg.
Содержание MEGA VPZ NK
Страница 1: ...MEGA VPZ Original Instruction book 67050600 110 version 1 10 GB 03 2018 www hardi international com...
Страница 4: ...1 EU Declaration 4...
Страница 10: ...Table of Contents 10...
Страница 42: ...2 Safety Notes 42...
Страница 68: ...3 Description 68...
Страница 118: ...5 Operation 118...
Страница 121: ...6 Maintenance 121 Lubrication Plan Boom Centre Close up of Glide Shoes to be Lubricated...
Страница 122: ...6 Maintenance 122 Lubrication Plan Boom Wings Both boom wings left and right are to be lubricated equally 10...
Страница 172: ...8 Technical Specifications 172...
Страница 176: ...Index 176...
Страница 178: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...