![Hardi MEGA VPZ NK Скачать руководство пользователя страница 110](http://html1.mh-extra.com/html/hardi/mega-vpz-nk/mega-vpz-nk_original-instruction-book_3927489110.webp)
5 - Operation
110
Quick Reference - Cleaning
ATTENTION! Pump speed 250-280 rpm.
A.
Turn On.
B.
Turn Off.
C.
Minimum 45 seconds with nozzles Off.
D.
Spray until air comes out of nozzles.
When the pressure drops, close the regulation valve by pressing the
button on the SetBox, until
yellow LED lights on the valve (this can take up to 10 seconds).
Without DF4 system: When the boom is completely empty, press the
button for a few seconds
to avoid a pressure spike.
With DF4 system: Press “auto” to have the system remove pressure spikes automatically before next
start-up.
5 x 1/6
5 x 1/6
1/6
A
B
C
C
D
D
Содержание MEGA VPZ NK
Страница 1: ...MEGA VPZ Original Instruction book 67050600 110 version 1 10 GB 03 2018 www hardi international com...
Страница 4: ...1 EU Declaration 4...
Страница 10: ...Table of Contents 10...
Страница 42: ...2 Safety Notes 42...
Страница 68: ...3 Description 68...
Страница 118: ...5 Operation 118...
Страница 121: ...6 Maintenance 121 Lubrication Plan Boom Centre Close up of Glide Shoes to be Lubricated...
Страница 122: ...6 Maintenance 122 Lubrication Plan Boom Wings Both boom wings left and right are to be lubricated equally 10...
Страница 172: ...8 Technical Specifications 172...
Страница 176: ...Index 176...
Страница 178: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 N rre Alslev DENMARK...