
6 - Maintenance
148
10 Hours Service - CycloneFilter
Servicing the Filter
1.
Turn the pressure SmartValve towards the unused function or to
“tank cleaning nozzles”.
2.
Unscrew the filter lid (A).
3.
Lift lid and filter (B) away from the housing.
4.
Turn the two locks (C) outwards to unlock the filter from the lid.
5.
Separate filter from the integrated filter guide in the lid. Clean the
filter.
To reassemble
1.
Grease the two O-rings on the lid/filter guide. Due to small space
at the lid, use a paintbrush to apply the grease.
2.
Mount the filter onto the recess (which may not be greased) in the
lid/filter guide.
3.
Turn the two locks (C) inwards to lock the filter into position.
4.
Place the filter/filter lid into the housing and screw the lid, until it
hits the stop.
±
WARNING! Always wear protective clothing and gloves, before servicing the filter!
€
DANGER! The pressure SmartValve must always be turned to the unused function or to “tank cleaning nozzles” before
opening the CycloneFilter! If not, the spraying liquid can hit you, when opening the filter, and the main tank content
will drain away!
10 Hours Service - In-Line Filter
If PrimeFlow is installed in the spray boom, these filters are not included.
If the boom is equipped with In-Line filters, unscrew the filter bowl to
inspect and clean the filter. When reassembling, the O-ring should be
greased.
Alternative filter meshes are available. See the section “Filters” on
page 200.
±
WARNING! Be careful not to splash out liquid, when unscrewing
the filter bowl.
Always wear protective clothing and gloves, before servicing the
filter!
Содержание COMMANDER DELTA FORCE
Страница 4: ...1 EU Declaration 4 ...
Страница 44: ...2 General Safety Instructions 44 ...
Страница 78: ...3 Description 78 ...
Страница 104: ...4 Sprayer Setup 104 ...
Страница 136: ...5 Operation 136 ...
Страница 139: ...6 Maintenance 139 Lubrication Plan Boom Centre Close up of Grease Nipples 1 2 3 4 5 7 8 6 10 9 10 1 14 14 11 13 12 ...
Страница 165: ...6 Maintenance 165 5 Insert the locking piece in the upper part to secure it on the spray boom ...
Страница 186: ...6 Maintenance 186 ...
Страница 194: ...7 Fault Finding 194 ...
Страница 212: ...8 Technical Specifications 212 ...
Страница 216: ...Index 216 ...
Страница 218: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...