
5 - Operation
121
9.
If closed, turn the agitation valve towards “agitation”.
10.
When the spray liquid is well agitated, turn handle of the pressure
SmartValve towards “spraying” position. The agitation continues
during spraying of the crop.
μ
ATTENTION! If foaming is a problem, turn down the agitation.
Agitation Before Resuming a Spray Job
If a spray job has been interrupted for a while, severe sedimentation may
occur depending on the chemicals being used. Before resuming the
spray job, it might be necessary to agitate sediment material.
1.
Turn the handle at the suction valve towards “Suction from main
tank”. Turn the pressure SmartValve towards “Pressure
draining/TurboFiller” and turn the agitation valve towards
“Agitation”. Other valves are closed.
2.
Engage the pump and set PTO speed to max. 540 rpm or 1000 rpm
(depending on pump model).
3.
Agitation has started and should be continued for at least 10 minutes.
4.
The spray job can now be resumed. Turn pressure SmartValve towards “Spraying” and start spraying.
€
DANGER! Before turning Pressure SmartValve to “Pressure draining/TurboFiller” it is very important to be sure that the
quick coupler lid is correct and completely mounted to the filling stud into its locked position. Failure to do so may
cause risk of contamination and injury from quick coupler lid being “shot” off when pressurized! If not possible to
mount lid completely, lubricate the rubber seal and the grip hooks.
Содержание COMMANDER DELTA FORCE
Страница 4: ...1 EU Declaration 4 ...
Страница 44: ...2 General Safety Instructions 44 ...
Страница 78: ...3 Description 78 ...
Страница 104: ...4 Sprayer Setup 104 ...
Страница 136: ...5 Operation 136 ...
Страница 139: ...6 Maintenance 139 Lubrication Plan Boom Centre Close up of Grease Nipples 1 2 3 4 5 7 8 6 10 9 10 1 14 14 11 13 12 ...
Страница 165: ...6 Maintenance 165 5 Insert the locking piece in the upper part to secure it on the spray boom ...
Страница 186: ...6 Maintenance 186 ...
Страница 194: ...7 Fault Finding 194 ...
Страница 212: ...8 Technical Specifications 212 ...
Страница 216: ...Index 216 ...
Страница 218: ...HARDI INTERNATIONAL A S Herthadalvej 10 DK 4840 Nørre Alslev DENMARK ...