In-servicetests

Purpose

The purpose of in-service tests is to regularly monitor and 
record the performance of the thermostatic mixing valve. 
Deterioration  in  performance  can  indicate  the  need  for 
service work on the valve and/ or the water supplies.

Procedure

1.

  Carry out the procedure 2. (a) to (e) on page 18 using 

the same measuring equipment, or equipment to the 
same specifications.

2.

  If the mixed water temperature has changed signifi-

cantly from the previous test results (e.g. > 1 K), record 
the change and before re-adjusting the mixed water 
temperature check:

a)  that any in-line or integral strainers are clean
b)  any in-line or integral check valves or other anti-

backsiphonage devices are in good working order

c)  any isolating valves are fully open

3.

  With an acceptable mixed water temperature, com-

plete the procedure 2. (a) to (e) on page 18.

4.

  If at step 2. (e) on page 18 the final mixed water tem-

perature is greater than the values in Table A and / or 
the maximum temperature exceeds the corresponding 
value from the previous test results by more than about 
2 K, the need for service work is indicated.

 

NOTE: In-service tests should be carried out with a 
frequency  which  identifies  a  need  for  service  work 
before  an  unsafe  water  temperature  can  result.  In 
the absence of any other instruction or guidance, the 
procedure described in „Frequency of in-service tests“ 
may be used.

Frequency of in-service tests

TMV3*

General

In  the  absence  of  any  other  instruction  or  guidance  on 
the  means  of  determining  the  appropriate  frequency  of 
in-service testing, the following procedure may be used:

1.

  6 to 8 weeks after commissioning carry out the tests 

given in 2. on page 18.

2.

  12 to 15 weeks after commissioning carry out the tests 

given in 2. on page 18.

3.

  Depending on the results of 1. and 4. several possibi-

lities exist:

a)  If  no  significant  changes  (e.g.  <  1  K)  in  mixed 

water temperatures are recorded between com-
missioning and 1., or between commissioning and 
4. the next in-service test can be deferred to 24 to 
28 weeks after commissioning.

b)  If small changes (e.g. 1 to 2 K) in mixed water 

temperatures are recorded in only one of these pe-
riods, necessitating adjustment of the mixed water 
temperature, then the next in-service test can be 
deferred to 24 to 28 weeks after commissioning.

c)  If small changes (e.g. 1 to 2 K) in mixed water 

temperatures are recorded in both of these peri-
ods, necessitating adjustment of the mixed water 
temperature, then the next in-service test should be 
carried out at 18 to 21 weeks after commissioning.

d)  If significant changes (e.g. > 2 K) in mixed water 

temperatures  are  recorded  in  either  of  these 
periods, necessitating service work, then the next 
in-service test should be carried out at 18 to 21 
weeks after commissioning.

4.

  The general principle to be observed after the first 2 

or 3 in-service tests is that the intervals of future tests 
should be set to those which previous tests have shown 
can be achieved with no more than a small change in 
mixed water temperature.

*TMV2: The frequency of performing the in-

servicetestsis1yearmaximum.

Содержание Ecomax 13354000

Страница 1: ...DE Gebrauchsanleitung Montageanleitung 2 EN Instructions for use assembly instructions 4 Ecomax 13356000 Ecomax 13354000...

Страница 2: ...optional erh ltliche Drossel Artikelnummer 97510000 in den Kaltwasser zulauf eingesetzt werden Technische Daten Betriebsdruck max 1 MPa Empfohlener Betriebsdruck 0 1 0 5 MPa Pr fdruck 1 6 MPa 1 MPa 1...

Страница 3: ...ckflussverhinderer reinigen ggf austauschen Auslauftemperatur stimmt nicht mit der eingestellten Temperatur berein Thermostat wurde nicht justiert Thermostat justieren Zu niedrige Warmwassertemperatu...

Страница 4: ...install a water limiter to the cold supply ordered separately article number 97510000 Technical Data Operating pressure max 1 MPa Recommended operating pressure 0 1 0 5 MPa Test pressure 1 6 MPa 1 MP...

Страница 5: ...ty or leaking Clean backflow preventers ex change if necessary Spout temperature does not cor respond with temperature set Thermostat has not been adjusted Adjust thermostat Hot water temperature too...

Страница 6: ...6 X X 36 mm X 36 1 3b 2 3a 1 2 1 2 Silicone max 39 mm max 5 mm 1 2 5 4 36 mm SW 24 mm...

Страница 7: ...7 6 7 8 SW 30 mm 17 Nm...

Страница 8: ...8 Ecomax 13354000 Ecomax 13356000 R 1 2 R 1 2 P IX DVGW SVGW ACS WRAS ETA KIWA 13354000 X 13356000 X...

Страница 9: ...9 SW 3 mm SW 3 mm 2 Nm 1 3 4 2 5 6...

Страница 10: ...10 z B 42 C for example 42 C 4 3 1 2 5 1 2 S W 3 m m S W 3 m m 2 N m...

Страница 11: ...11 5 6 SW 30 mm SW 30 mm 17 Nm SW 12 mm SW 12 mm 20 Nm 4 1 1 2 2 3 1 2 SW 24 mm 1 2 SW 24 mm 20 Nm 1 2...

Страница 12: ...12 1 2 3...

Страница 13: ...13 schlie en close 90 ffnen open 1 2 kalt cold 40 C warm hot 90 1 2...

Страница 14: ...00 97211000 25x2 97164000 95041000 96633000 98147000 26x2 34x2 38x2 5 A 96264000 97162000 92929000 96264000 Ecomax 13356000 94140000 96429000 98163000 15x2 96157000 96467000 96922000 97220000 96644000...

Страница 15: ...terproofed wall surface usually tiles If you are using power tools e g to drill holes wear sa fety glasses and always disconnect tools from the power supply after use Do not operate the shower unit if...

Страница 16: ...herent in thermostatic mixing valves and temperature losses in metal baths It is not a safe bathing temperature for adults or children The British Burns Association recommends 37 to 37 5 C as Installa...

Страница 17: ...17 KEY Isolating valve Reducing valve Mixer Valve Pump Gas Combination Boiler multi point Unvented System pressure balanced Pumped System...

Страница 18: ...me simple checks and tests on each mixing valve to provide a performance reference point for future in service tests Procedure 1 Check that a the designation of the thermostatic mixing valve matches t...

Страница 19: ...ce of any other instruction or guidance on the means of determining the appropriate frequency of in service testing the following procedure may be used 1 6 to 8 weeks after commissioning carry out the...

Страница 20: ...xer is fitted with check valves page 14 pos 96644000 and filters page 14 pos A and 96922000 If the water flow drops the filters need to be cleaned For that purpose please follow the steps 1 8 on page...

Отзывы: