9 Installation
Installation tee
• Install the probe in a tee, horizontally, and direct the flow into the opening at the bottom of the probe.
• Upward flow direction must always be ensured.
• Maintain a stable flow rate to minimize interferences from bubbles and settling of particulates.
• Wrap Teflon™ tape around the probe’s threads and fittings before mounting.
FLOW
FLO
W
1
2
4
3
1 Tee
3/4
” NPT
2 Vent hole
3 O-ring
4 Probe
Tank immersion with submersible electrode holder
I
II
III
1
2
4
3
5
6
7
9
8
1 Probe cable
2 Cable gland
3 Electrode holder cap
4 Adjustable immersion level
5 Electrode holder
6 Probe body
7 O-ring, Ø 22.2 mm (0.87”)
8 Sensor tip
9 Protective end cap
The
HI60501
/
HI60503
(PVC / PVDF submersible holders) together with
HI60501-2
/
HI60503-2
(PVC / PVDF
protective end caps), and
HI605011
(mounting flange) provide a sturdy housing that prevents the probe from
being damaged. For high-temperature/complex chemical processes it is recommended the use of PVDF accessories.