![Hankscraft Runxin HS Series Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/hankscraft-runxin/hs-series/hs-series_service-manual_3618730019.webp)
HS / HL Valves & Systems Service Manual
Hankscraft Runxin, LLC 300 Wengel Drive 608.524.9465 hrh2o.com [email protected]
19
HS-FTC / HL-FTC Timer Control Valve Start-Up Procedure
1.
Manually index the valve to the Service position and allow water to flow into the resin tank
(pressure tank). When the water flow stops, open a water tap until all air is released from the
lines. Close tap.
Regeneration cycles may be dialed manually by turning the knob clockwise until the desired
cycle appears.
2.
Manually index the valve to Backwash position; allow water to flow out the drain for 3 to 4
minutes for color throw.
3.
Plug the valve into an approved power source. Preferably a GFI grounded outlet. Look in the sight
hole in the back of the motor to see that it is running.
4.
Set the days that regeneration is to occur by sliding tabs on the Skipper Wheel outward. Each tab
equals one day. Move clockwise from indicator to obtain the desired regeneration schedule. The
tab at the red indicator is tonight.
5.
Turn a faucet on, away from the installation location, until the water from the plumbing lines has
been purged.
6.
Filtering system is now fully operational.