![Hankscraft Runxin HS Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/hankscraft-runxin/hs-series/hs-series_service-manual_3618730017.webp)
HS / HL Valves & Systems Service Manual
Hankscraft Runxin, LLC 300 Wengel Drive 608.524.9465 hrh2o.com [email protected]
17
5.
Valve Start-Up Procedures
HS-STC / HL-STC Timer Control Valve Start-Up Procedure
1.
Make sure the bypass valve is in the service position. Manually index the valve to the Service
position and allow water to flow into the resin tank (pressure tank). When the water flow stops,
open a softened water tap until all air is released from the lines. Close tap.
Regeneration cycles may be dialed manually by turning the knob clockwise until the desired
cycle appears.
2.
Manually index the valve to Backwash position; allow water to flow out the drain for 3 to 4
minutes for color throw.
3.
Remove back cover plate. Make sure the salt wheel is set to desired dosage.
4.
Manually index the control to the Brine Refill position and allow the brine tank to fill to the top of
the air check.
5.
Manually index the valve to the Brine Draw position, allow the valve to draw water from the
brine tank until it stops.
6.
Plug the valve into an approved power source. Preferably a GFI grounded outlet. Look in the sight
hole in the back of the motor to see that it is running.