![Hankscraft Runxin HS Series Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/hankscraft-runxin/hs-series/hs-series_service-manual_3618730018.webp)
HS / HL Valves & Systems Service Manual
Hankscraft Runxin, LLC 300 Wengel Drive 608.524.9465 hrh2o.com [email protected]
18
7.
Set the days that regeneration is to occur by sliding tabs on Skipper Wheel outward. Each tab is
one day. Move clockwise from indicator to obtain the desired regeneration schedule. The tab at
the red indicator is tonight.
8.
Manually advance the valve to the beginning of the Brine Refill position and allow the valve to
return to the In Service position automatically. This will fill the brine tank with the correct
amount of water.
9.
Now add salt to the brine tank. (40 lbs. minimum, 120 lbs. maximum)
We recommend using pellet salt, NOT solar or rock salt. Install brine tank cover.
10.
Replace back cover plate on the valve. Be sure cable is not pinched between cover and housing.
11.
Turn a faucet on, away from the installation location, until the water from the plumbing lines has
been purged.
12.
Softening system is now fully operational.
13.
Take a water sample to verify and test for hardness reduction.
Hardness
PPM
(GPG)
17-85
(1-5)
86-170
(6-10)
171-
256
(11-15)
257-
342
(16-20)
343-
427
(21-25)
428-513
(26-30)
514-
598
(31-35)
599-684
(36-40)
685-769
(41-45)
770-855
(46-50)
856-940
(51-55)
941-
1026
(56-60)
1027-
1111
(61-65)
1112-
1197
(66-70)
1198-
1282
(71-75)
1283-
1368
(76-80)
No. Of
People
Softeners - Calendar Clock Regeneration Frequency – Number Of Tab Pulls
2
1
1
1
1
1
2
2
2
2
2
3
3
3
3
3
3
3
1
1
2
2
3
3
3
3
3
3
4
4
4
4
4
4
4
1
2
2
2
3
3
3
4
4
4
6
6
6
6
6
6
5
2
2
3
3
4
4
4
4
6
6
6
6
12
12
12
12
6
2
2
3
3
4
4
4
6
6
12
12
12
12
12
12
12
7
2
3
3
4
4
6
6
6
12
12
12
12
12
12
12
12
8
2
3
3
4
6
6
6
6
12
12
12
12
12
12
12
12
9
3
3
4
4
6
6
12
12
12
12
12
12
12
12
12
12
10
3
4
4
6
6
12
12
12
12
12
12
12
12
12
12
12