43
FINISH
5
Keep spacing between the center of
the rafters at the lower edge of the
panel and secure with one 2" nail into
each rafter
(Fig. A)
.
Move to the top of the panel and keep
spacing between the center of the
rafters. Secure with one 2" nail into
each rafter
(Fig. A)
.
Nail the roof panel using 2" nails 6"
apart on edges and 12" apart inside
panel.
Attach the
23-7/8 x 35-3/8"
upper roof
panel ush to rst panel, ush at peak
and with the 1/4" measurement
(Fig. B, C )
.
3
Attach the lower roof panels ush to the
upper panels
(Fig. D)
and 3/4" on rafter
(Fig. E)
and with a 1/4" measurement at
the gable trim
(Fig. F)
.
Nail the roof panel using 2" nails 6" apart
on edges and 12" apart inside panel.
Repeat Steps 1-5 to attach roof panels
on the opposite side.
4
PARTS REQUIRED:
DOOR
7/16 x 23-7/8 x 35-3/8"
(1,1 x 60,6 x 89,9 cm)
Fig. B
1/4"
(0,6 cm)
Fig. C
Flush
Gable Trim
12"
(30,5 cm)
6" (15,2 cm)
22-1/4"
(56,5 cm)
24"
(61 cm)
22-1/4"
(56,5 cm)
24"
(61 cm)
24"
(61 cm)
Fig. A
2" Nail
NOTE:
Measurements from inside of panels
23-7/8"
(60,6 cm)
23-7/8"
(60,6 cm)
23-7/8"
(60,6 cm)
11-1/2"
(29,2 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
Fig. E
Fig. D
Flush
1/4"
(0,6 cm)
Gable
Trim
Fig. F
96"
(244 cm)
96"
(244 cm)
DOOR
DOOR
2" (5 cm)
x170
ROOF PANELS
7/16 x 23-7/8 x 23-7/8"
(1,1 x 60,6 x 60,6 cm)
x2
7/16 x 23-7/8 x 96"
(1,1 x 60,6 x 244 cm)
x2
x2
7/16 x 23-7/8 x 35-3/8"
(1,1 x 60,6 x 89,9 cm)
7/16 x 11-1/2 x 23-7/8"
(1,1 x 29,2 x 60,6 cm)
x2
7/16 x 11-1/2 x 96"
(1,1 x 29,2 x 244 cm)
x2
7/16 x 35-3/8 x 96"
(1,1 x 89,9 x 244 cm)
x1
3/4"
GAUGE BLOCK
GAA
Содержание MARCO Series
Страница 2: ...This page intentionally left blank...